EEE Group

Projects

Projects Across Our Brands

Classic Fashion Aqaba

About project

Titan delivered a specialized industrial lift solution for the Valmont manufacturing facility in Dubai. Designed for factory operations, the lift supports efficient vertical transportation within an industrial environment, emphasizing robustness, safety, and consistent performance under demanding operational conditions.

Features of Project

High-load handling capability: Lift engineered to transport heavy goods and materials efficiently across multiple factory levels.

Reliable operational flow: Designed for frequent start–stop cycles, ensuring smooth and consistent movement during continuous daily operations.

Industrial-grade safety systems: Equipped with reinforced safety mechanisms and emergency features suitable for factory environments.

Energy-efficient performance: Optimized drive and control systems to support efficient operation while managing high usage demands.

Robust construction: Heavy-duty components built to withstand demanding industrial conditions and long-term operational loads.

Functional cabin design: Practical, durable cabin finishes designed for easy maintenance and safe handling of goods and equipment.

Working Process

01
Step

Design & Planning

We study project requirements and create a tailored elevator solution that fits the building’s needs.
02
Step

Engineering & Fabrication

Our team prepares the technical designs and oversees the manufacturing of all components to ensure quality.
03
Step

Installation & Testing

Certified engineers install the system and perform full safety and performance testing.
04
Step

Handover & Maintenance

We hand over the completed system and provide ongoing after-sales and maintenance services for long-term reliability.

Project Information

 

Client Name

Classic Fashion Aqaba

Project Type

Passenger Elevators & Freight Elevators

Category

Titan New Lifts

CONTRACTOR

Classic Fashion Contracting

Location

Jordan

Units / stops

8 Units

Firas Haddad Project

About project

Titan delivered a specialized industrial lift solution for the Valmont manufacturing facility in Dubai. Designed for factory operations, the lift supports efficient vertical transportation within an industrial environment, emphasizing robustness, safety, and consistent performance under demanding operational conditions.

Features of Project



High-load handling capability: Lift engineered to transport heavy goods and materials efficiently across multiple factory levels.

Reliable operational flow: Designed for frequent start–stop cycles, ensuring smooth and consistent movement during continuous daily operations.

Industrial-grade safety systems: Equipped with reinforced safety mechanisms and emergency features suitable for factory environments.

Energy-efficient performance: Optimized drive and control systems to support efficient operation while managing high usage demands.

Robust construction: Heavy-duty components built to withstand demanding industrial conditions and long-term operational loads.

Functional cabin design: Practical, durable cabin finishes designed for easy maintenance and safe handling of goods and equipment.

Working Process

01
Step

Design & Planning

We study project requirements and create a tailored elevator solution that fits the building’s needs.
02
Step

Engineering & Fabrication

Our team prepares the technical designs and oversees the manufacturing of all components to ensure quality.
03
Step

Installation & Testing

Certified engineers install the system and perform full safety and performance testing.
04
Step

Handover & Maintenance

We hand over the completed system and provide ongoing after-sales and maintenance services for long-term reliability.

Project Information

Client Name

Firas Haddad Complex

Project Type

Passenger Elevators & Freight Elevators

Category

Titan New Lifts

Location

Jordan

Units / stops

8 units

Ramzi Lozeh Villa

About project

Titan delivered a specialized industrial lift solution for the Valmont manufacturing facility in Dubai. Designed for factory operations, the lift supports efficient vertical transportation within an industrial environment, emphasizing robustness, safety, and consistent performance under demanding operational conditions.

Features of Project



High-load handling capability: Lift engineered to transport heavy goods and materials efficiently across multiple factory levels.

Reliable operational flow: Designed for frequent start–stop cycles, ensuring smooth and consistent movement during continuous daily operations.

Industrial-grade safety systems: Equipped with reinforced safety mechanisms and emergency features suitable for factory environments.

Energy-efficient performance: Optimized drive and control systems to support efficient operation while managing high usage demands.

Robust construction: Heavy-duty components built to withstand demanding industrial conditions and long-term operational loads.

Functional cabin design: Practical, durable cabin finishes designed for easy maintenance and safe handling of goods and equipment.

Working Process

01
Step

Design & Planning

We study project requirements and create a tailored elevator solution that fits the building’s needs.
02
Step

Engineering & Fabrication

Our team prepares the technical designs and oversees the manufacturing of all components to ensure quality.
03
Step

Installation & Testing

Certified engineers install the system and perform full safety and performance testing.
04
Step

Handover & Maintenance

We hand over the completed system and provide ongoing after-sales and maintenance services for long-term reliability.

Project Information

Client Name

Mr.Ramzi Lozeh

Project Type

Platform Lifts

Category

Titan New Lifts

CONSULTANT

Mr.Ramzi Lozeh

Location

Jordan

Units / stops

1 unit

DAMAC Evergreen Fiora-B

About project

At Evergreen Flora B, EEE Group is progressing with the installation of 3 Shanghai Mitsubishi elevator units serving 9 stops. This mid-rise residential development requires dependable and efficient vertical transportation tailored for consistent daily use. The system is being implemented to ensure smooth mobility, reliable performance, and long-term operational stability once commissioned.

Features of Project



Efficient Machine Configuration: Optimized for mid-rise applications with dependable performance.

Energy-Saving Operational Mode: Reduces power consumption during low-traffic periods.

Enhanced Passenger Safety Systems: Includes emergency communication and safety monitoring circuits.

Reliable Door & Cabin Control Mechanisms: Ensures smooth entry and exit cycles with minimal downtime.

Working Process

01
Step

Design & Planning

We study project requirements and create a tailored elevator solution that fits the building’s needs.
02
Step

Engineering & Fabrication

Our team prepares the technical designs and oversees the manufacturing of all components to ensure quality.
03
Step

Installation & Testing

Certified engineers install the system and perform full safety and performance testing.
04
Step

Handover & Maintenance

We hand over the completed system and provide ongoing after-sales and maintenance services for long-term reliability.

Project Information

Client Name

DAMAC PROPERTIES

Category

Shanghai Mitsubishi Elevator

Consultant

Al Majal Engineering Consultants

Contractors

Draieh Contracting LLC

Location

Dubai

Units / stops

3 units, 9 stops

Speed

1.75 m/s

PROJECT STATUS

Currently under Execution

Oceanz by Danube

About project

EEE Group is delivering 39 Shanghai Mitsubishi elevators engineered to serve up to 50 stops at Oceanz by Danube Properties. This ongoing installation supports high-density residential movement with high-speed capability, ride comfort, and precision engineering suitable for premium waterfront living.

Features of Project



High-Speed Elevator Configuration:Designed for efficient vertical travel across 50 floors while maintaining ride stability and comfort.

Smart Dispatching Technology: Distributes passenger demand intelligently to minimize congestion and optimize journey times.

Low-Noise & Vibration Control Engineering: Ensures quiet operation and enhanced cabin comfort for residents.

Durable Long-Life Components: Built with high-grade materials to ensure long-term reliability and reduced maintenance cycles.

Working Process

01
Step

Design & Planning

We study project requirements and create a tailored elevator solution that fits the building’s needs.
02
Step

Engineering & Fabrication

Our team prepares the technical designs and oversees the manufacturing of all components to ensure quality.
03
Step

Installation & Testing

Certified engineers install the system and perform full safety and performance testing.
04
Step

Handover & Maintenance

We hand over the completed system and provide ongoing after-sales and maintenance services for long-term reliability.

Project Information

Client Name

Danube Properties

Category

Shanghai Mitsubishi Elevator

Consultant

Canadian Consulting Engineers

Contractors

RAQ Contracting LLC

Location

Dubai

Units / stops

39 units, 50 stops

Speed

4 m/s

PROJECT STATUS

Currently under Execution

Vivid Tower

About project

Installation activities are progressing at V1VID Tower, where 4 Shanghai Mitsubishi elevators serving 21 stops are being delivered by EEE Group. The system is tailored to modern residential standards, ensuring reliable daily performance and comfortable vertical mobility.

Features of Project



Advanced Traction Drive Technology: Engineered for consistent high-rise performance, ensuring smooth acceleration and deceleration across all 40 stops.

Intelligent Group Supervisory Control: Optimizes traffic flow during peak hours, reducing waiting time and improving passenger movement efficiency.

Energy-Efficient Regenerative System: Converts excess energy into reusable power, reducing overall energy consumption and supporting sustainable building goals.

Comprehensive Safety & Monitoring Systems: Equipped with advanced safety circuits, real-time diagnostics, and emergency response features for maximum operational security.

Working Process

01
Step

Design & Planning

We study project requirements and create a tailored elevator solution that fits the building’s needs.
02
Step

Engineering & Fabrication

Our team prepares the technical designs and oversees the manufacturing of all components to ensure quality.
03
Step

Installation & Testing

Certified engineers install the system and perform full safety and performance testing.
04
Step

Handover & Maintenance

We hand over the completed system and provide ongoing after-sales and maintenance services for long-term reliability.

Project Information

Client Name

Object1 Real Estate Development LLC

Category

Shanghai Mitsubishi Elevator

Consultant

Future Art Engineering Consultancy 

Contractors

D S C A Building Contracting L.L.C

Location

Dubai

Units / stops

4 units, 21 stops

Speed

2.5 m/s

PROJECT STATUS

Currently under Execution

ELO 1 by DAMAC

About project

At Elo Park 1, EEE Group is implementing 9 Shanghai Mitsubishi elevator units serving 17 stops within this modern residential tower. The installation reflects a focus on dependable vertical mobility solutions that combine smooth travel performance with operational efficiency.

Features of Project



Controlled Acceleration & Deceleration: Provides smooth and balanced floor transitions.

Smart Energy Optimization: Supports reduced operational consumption.

Reliable Door Operation System:Ensures safe and consistent performance.

Continuous Performance Monitoring: Enhances reliability through system oversight.

Working Process

01
Step

Design & Planning

We study project requirements and create a tailored elevator solution that fits the building’s needs.
02
Step

Engineering & Fabrication

Our team prepares the technical designs and oversees the manufacturing of all components to ensure quality.
03
Step

Installation & Testing

Certified engineers install the system and perform full safety and performance testing.
04
Step

Handover & Maintenance

We hand over the completed system and provide ongoing after-sales and maintenance services for long-term reliability.

Project Information

Client Name

DAMAC PROPERTIES

Category

Shanghai Mitsubishi Elevator

Consultant

Khatib & Alami Consolidated Engineering Co. LLC

Contractors

Draieh Contracting LLC

Location

Dubai

Units / stops

9 units, 17 stops

Speed

2.5 m/s

ONDA BY KASCO

About project

At ONDA by KASCO, EEE Group is delivering 5 Shanghai Mitsubishi elevator units serving 23 stops. The ongoing works are focused on implementing a reliable and efficient vertical transportation system that will support the building’s residential functionality once completed.

Features of Project



Balanced Ride Comfort: Ensures a stable and pleasant passenger experience.

High-Quality Construction Standards: Supports durability and structural integrity.

Advanced safety technology: Equipped with the latest international safety standards.

Reliable Daily Service Performance: Designed to maintain consistent residential operation.

Working Process

01
Step

Design & Planning

We study project requirements and create a tailored elevator solution that fits the building’s needs.
02
Step

Engineering & Fabrication

Our team prepares the technical designs and oversees the manufacturing of all components to ensure quality.
03
Step

Installation & Testing

Certified engineers install the system and perform full safety and performance testing.
04
Step

Handover & Maintenance

We hand over the completed system and provide ongoing after-sales and maintenance services for long-term reliability.

Project Information

Client Name

KASCO REAL ESTATE LLC

Category

Shanghai Mitsubishi Elevator

Consultant

Next Engineering Consultants

Contractors

La Mida Contracting LLC 

Location

Dubai

Units / stops

5 units, 23 stops

Speed

2.5 m/s

PROJECT STATUS

Currently under Execution

DAMAC Lagoon Views 13 & 14

About project

As part of this larger residential phase, 28 Shanghai Mitsubishi elevator units serving 15 stops are being executed by EEE Group at Lagoon Views 13 & 14. The scale of the development requires coordinated elevator performance to support higher occupancy and ensure seamless vertical transportation throughout the buildings.

Features of Project



Group Control Coordination System: Synchronizes elevator movement to maximize efficiency.

High-Efficiency Motor Drive Units: Deliver consistent torque and smooth ride performance.

Reduced Noise & Vibration Engineering: Enhances passenger comfort across all floors.

Long-Term Operational Reliability Design: Built for high usage cycles with minimized maintenance needs.

Working Process

01
Step

Design & Planning

We study project requirements and create a tailored elevator solution that fits the building’s needs.
02
Step

Engineering & Fabrication

Our team prepares the technical designs and oversees the manufacturing of all components to ensure quality.
03
Step

Installation & Testing

Certified engineers install the system and perform full safety and performance testing.
04
Step

Handover & Maintenance

We hand over the completed system and provide ongoing after-sales and maintenance services for long-term reliability.

Project Information

Client Name

DAMAC PROPERTIES

Category

Shanghai Mitsubishi Elevator

Consultant

Engineering Consortium Consulting Engineers

Contractors

Draieh Contracting LLC

Location

Dubai

Units / stops

28 units, 15 stops

Speed

1.75 m/s

PROJECT STATUS

Currently under Execution

Elitz 3 by Danube

About project

The installation of 14 Shanghai Mitsubishi elevator units serving up to 50 stops is currently underway at Elitz 3. This ongoing execution phase reflects EEE Group’s expertise in high-rise elevator engineering, tailored to meet demanding residential traffic requirements. The system is configured to ensure smooth vertical mobility, intelligent traffic handling, and operational reliability that supports the tower’s daily functionality and long-term performance objectives.

Features of Project



High-Rise Optimized Traction Machines: Designed for stable, high-speed travel across extended floor ranges.

Intelligent Traffic Management Software: Improves passenger flow and reduces waiting times during peak occupancy.

Advanced Door Operation Control: Enhances safety and minimizes door wear for long-term durability.

Real-Time Monitoring & Diagnostics: Enables proactive maintenance and continuous performance tracking.

Working Process

01
Step

Design & Planning

We study project requirements and create a tailored elevator solution that fits the building’s needs.
02
Step

Engineering & Fabrication

Our team prepares the technical designs and oversees the manufacturing of all components to ensure quality.
03
Step

Installation & Testing

Certified engineers install the system and perform full safety and performance testing.
04
Step

Handover & Maintenance

We hand over the completed system and provide ongoing after-sales and maintenance services for long-term reliability.

Project Information

Client Name

Danube Properties

Category

Shanghai Mitsubishi Elevator

Consultant

Al Wasl Al Jadeed Consultants

Contractors

G&B Contracting LLC

Location

Dubai

Units / stops

14 units, 50 stops

Speed

4 m/s

PROJECT STATUS

Currently under Execution

Luminar Tower 1 | 2 | 3

About project

Luminar Towers will feature 12 Shanghai Mitsubishi elevator units serving 26 stops, currently being executed by EEE Group. This high-rise configuration requires stable long-distance travel performance and intelligent system coordination to support efficient residential mobility.

Features of Project



High-Rise Travel Stability: Ensures consistent performance across extended floor ranges.

Intelligent Dispatch System: Improves passenger distribution and response efficiency.

Energy-Saving Drive Technology: Enhances efficiency without compromising performance.

Robust Structural Engineering: Designed for durable high-rise operation.

Working Process

01
Step

Design & Planning

We study project requirements and create a tailored elevator solution that fits the building’s needs.
02
Step

Engineering & Fabrication

Our team prepares the technical designs and oversees the manufacturing of all components to ensure quality.
03
Step

Installation & Testing

Certified engineers install the system and perform full safety and performance testing.
04
Step

Handover & Maintenance

We hand over the completed system and provide ongoing after-sales and maintenance services for long-term reliability.

Project Information

Client Name

Object 1 Real Estate Development LLC

Category

Shanghai Mitsubishi Elevator

Consultant

CVTEC Consulting Engineers

Contractors

D S C A Building Contracting L.L.C

Location

JVT, Dubai

Units / stops

4 units, 26 stops

Speed

2.5 m/s

SpeedPROJECT STATUS

Currently under Execution

Sportz by Danube

About project

EEE Group is currently executing the installation of 16 high-performance Shanghai Mitsubishi elevator units serving up to 40 stops at Sportz by Danube Properties in the UAE. The system is engineered to manage high residential traffic efficiently while ensuring smooth vertical mobility, optimized travel times, and long-term operational reliability within the tower.

Features of Project



Advanced Traction Drive Technology: Engineered for consistent high-rise performance, ensuring smooth acceleration and deceleration across all 40 stops.

Energy-Efficient Regenerative System: Converts excess energy into reusable power, reducing overall energy consumption and supporting sustainable building goals.

Comprehensive Safety & Monitoring Systems: Equipped with advanced safety circuits, real-time diagnostics, and emergency response features for maximum operational security.

Elegant cabin finishes: Modern interiors complementing the luxury design of the building.

Working Process

01
Step

Design & Planning

We study project requirements and create a tailored elevator solution that fits the building’s needs.
02
Step

Engineering & Fabrication

Our team prepares the technical designs and oversees the manufacturing of all components to ensure quality.
03
Step

Installation & Testing

Certified engineers install the system and perform full safety and performance testing.
04
Step

Handover & Maintenance

We hand over the completed system and provide ongoing after-sales and maintenance services for long-term reliability.

Project Information

Client Name

Danube Properties

Category

Shanghai Mitsubishi Elevator

Consultant

Next Engineering Consultants

Contractors

HRE Construction

Location

Dubai

Units / stops

16 units, 40 stops

Speed

4 m/s

Project Status

Currently Under Execution

DAMAC Lagoon Views 11 & 12

About project

EEE Group is advancing the elevator installation works at Lagoon Views 11 & 12, where 16 Shanghai Mitsubishi units will serve 8 stops across the development. The project focuses on delivering efficient and reliable vertical circulation within a growing residential community, ensuring smooth access and consistent ride comfort.

Features of Project



High-capacity system: 16 elevators designed to support smooth and efficient resident traffic throughout the buildings.

Smooth & quiet operation: Enhanced ride quality ensuring a calm and pleasant daily commute for residents.

Advanced safety technology: Equipped with the latest international safety standards.

Energy-efficient performance: Optimized systems to reduce power consumption.

Reliable for high usage: Reliable, long-life components designed for round-the-clock operation.

Working Process

01
Step

Design & Planning

We study project requirements and create a tailored elevator solution that fits the building’s needs.
02
Step

Engineering & Fabrication

Our team prepares the technical designs and oversees the manufacturing of all components to ensure quality.
03
Step

Installation & Testing

Certified engineers install the system and perform full safety and performance testing.
04
Step

Handover & Maintenance

We hand over the completed system and provide ongoing after-sales and maintenance services for long-term reliability.

Project Information

Client Name

DAMAC PROPERTIES

Category

Shanghai Mitsubishi Elevator

Consultant

Engineering Consortium Consulting Engineers

Contractors

China Energy Construction Group Co Ltd.

Location

Dubai

Units / stops

16 units, 8 stops

Speed

1.0 m/s

Project Status

Currently Under Execution

Elitz 2 by Danube

About project

EEE Group is currently executing the installation of 14 Shanghai Mitsubishi elevators serving 48 stops at Elitz 2. The project emphasizes efficient vertical integration within a modern residential tower, ensuring smooth circulation between floors while maintaining safety and ride precision. The elevator configuration is carefully engineered to balance performance, energy optimization, and long-term durability, supporting the developer’s commitment to delivering high-quality living environments in the UAE market.

Features of Project



High-capacity system: 14 elevators designed to support smooth and efficient resident traffic throughout the building.

Smooth & quiet operation: Enhanced ride quality ensuring a calm and pleasant daily commute for residents.

Advanced safety technology: Equipped with the latest international safety standards.

Energy-efficient performance: Optimized systems to reduce power consumption.

Reliable for high usage: Reliable, long-life components designed for round-the-clock operation.

Working Process

01
Step

Design & Planning

We study project requirements and create a tailored elevator solution that fits the building’s needs.
02
Step

Engineering & Fabrication

Our team prepares the technical designs and oversees the manufacturing of all components to ensure quality.
03
Step

Installation & Testing

Certified engineers install the system and perform full safety and performance testing.
04
Step

Handover & Maintenance

We hand over the completed system and provide ongoing after-sales and maintenance services for long-term reliability.

Project Information

Client Name

Danube Properties

Category

Shanghai Mitsubishi Elevator

Consultant

Al Wasl Al Jadeed Consultants

Contractors

Rose City Contracting L.L.C

Location

Dubai

Units / stops

14 units, 48 stops

Speed

4 m/s

Project Status

Currently Under Execution

Horizon Beach Hotel

About project

EEE Group supplied Unidome systems for Horizon Beach Hotel in Kuwait. The solution supported efficient floor spans, reduced concrete consumption, and enhanced overall structural performance while maintaining cost-effective and sustainable construction.

Features of Project



Massive concrete reduction: Reduces concrete usage by up to 20–30%, lowering carbon emissions dramatically.

Lightweight slab design: Creates stronger yet lighter slabs, reducing overall building load.

Eco-friendly recycled material: Void formers are produced from high-quality recycled plastic, supporting circular construction.

Cost-efficient construction: Less concrete, less steel, and faster installation reduce overall project costs.

Improved structural performance: Enhances load distribution and allows for longer spans with fewer columns.

Certified sustainability solution: Fully compliant with international green building standards

Working Process

01
Step

Design & Planning

We study project requirements and create a tailored elevator solution that fits the building’s needs.
02
Step

Engineering & Fabrication

Our team prepares the technical designs and oversees the manufacturing of all components to ensure quality.
03
Step

Installation & Testing

Certified engineers install the system and perform full safety and performance testing.
04
Step

Handover & Maintenance

We hand over the completed system and provide ongoing after-sales and maintenance services for long-term reliability.

Project Information

Project Name

Horizon Beach Hotel

Project Type

Hospitality Project

Category

Unidome

Location

Kuwait

Taiba Hospital

About project

EEE Group supplied Unidome systems for Taiba Hospital in Kuwait. The solution supported efficient floor spans, reduced concrete consumption, and enhanced overall structural performance while maintaining cost-effective and sustainable construction.

Features of Project



Massive concrete reduction: Reduces concrete usage by up to 20–30%, lowering carbon emissions dramatically.

Lightweight slab design: Creates stronger yet lighter slabs, reducing overall building load.

Eco-friendly recycled material: Void formers are produced from high-quality recycled plastic, supporting circular construction.

Cost-efficient construction: Less concrete, less steel, and faster installation reduce overall project costs.

Improved structural performance: Enhances load distribution and allows for longer spans with fewer columns.

Certified sustainability solution: Fully compliant with international green building standards

Working Process

01
Step

Design & Planning

We study project requirements and create a tailored elevator solution that fits the building’s needs.
02
Step

Engineering & Fabrication

Our team prepares the technical designs and oversees the manufacturing of all components to ensure quality.
03
Step

Installation & Testing

Certified engineers install the system and perform full safety and performance testing.
04
Step

Handover & Maintenance

We hand over the completed system and provide ongoing after-sales and maintenance services for long-term reliability.

Project Information

Project Name

Taiba Hospital

Project Type

Hospital Project

Category

Unidome

Location

Kuwait

Al Padel

About project

EEE Group supplied Unidome systems for Al Padel in Kuwait. The solution supported efficient floor spans, reduced concrete consumption, and enhanced overall structural performance while maintaining cost-effective and sustainable construction.

Features of Project



Massive concrete reduction: Reduces concrete usage by up to 20–30%, lowering carbon emissions dramatically.

Lightweight slab design: Creates stronger yet lighter slabs, reducing overall building load.

Eco-friendly recycled material: Void formers are produced from high-quality recycled plastic, supporting circular construction.

Cost-efficient construction: Less concrete, less steel, and faster installation reduce overall project costs.

Improved structural performance: Enhances load distribution and allows for longer spans with fewer columns.

Certified sustainability solution: Fully compliant with international green building standards

Working Process

01
Step

Design & Planning

We study project requirements and create a tailored elevator solution that fits the building’s needs.
02
Step

Engineering & Fabrication

Our team prepares the technical designs and oversees the manufacturing of all components to ensure quality.
03
Step

Installation & Testing

Certified engineers install the system and perform full safety and performance testing.
04
Step

Handover & Maintenance

We hand over the completed system and provide ongoing after-sales and maintenance services for long-term reliability.

Project Information

Project Name

AL Padel

Project Type

Hospitality Project

Category

Unidome

Location

Kuwait

Al Sager Mall

About project

EEE Group supplied Unidome systems for Al Sager Mall in Jordan. The solution supported efficient floor spans, reduced concrete consumption, and enhanced overall structural performance while maintaining cost-effective and sustainable construction.

Features of Project

Massive concrete reduction: Reduces concrete usage by up to 20–30%, lowering carbon emissions dramatically.

Lightweight slab design: Creates stronger yet lighter slabs, reducing overall building load.

Eco-friendly recycled material: Void formers are produced from high-quality recycled plastic, supporting circular construction.

Cost-efficient construction: Less concrete, less steel, and faster installation reduce overall project costs.

Improved structural performance: Enhances load distribution and allows for longer spans with fewer columns.

Certified sustainability solution: Fully compliant with international green building standards

Working Process

01
Step

Design & Planning

We study project requirements and create a tailored elevator solution that fits the building’s needs.
02
Step

Engineering & Fabrication

Our team prepares the technical designs and oversees the manufacturing of all components to ensure quality.
03
Step

Installation & Testing

Certified engineers install the system and perform full safety and performance testing.
04
Step

Handover & Maintenance

We hand over the completed system and provide ongoing after-sales and maintenance services for long-term reliability.

Project Information

 

Project Name

Al Sager Mall

Project Type

Commercial Project

Category

Unidome

Location

Kuwait

Arabella Hotel

About project

EEE Group supplied Unidome systems for four G+7 mixed-use commercial and residential buildings in Sharjah. The solution supported efficient floor spans, reduced concrete consumption, and enhanced overall structural performance while maintaining cost-effective and sustainable construction.

Features of Project



Massive concrete reduction: Reduces concrete usage by up to 20–30%, lowering carbon emissions dramatically.

Lightweight slab design: Creates stronger yet lighter slabs, reducing overall building load.

Eco-friendly recycled material: Void formers are produced from high-quality recycled plastic, supporting circular construction.

Cost-efficient construction: Less concrete, less steel, and faster installation reduce overall project costs.

Improved structural performance: Enhances load distribution and allows for longer spans with fewer columns.

Certified sustainability solution: Fully compliant with international green building standards

Working Process

01
Step

Design & Planning

We study project requirements and create a tailored elevator solution that fits the building’s needs.
02
Step

Engineering & Fabrication

Our team prepares the technical designs and oversees the manufacturing of all components to ensure quality.
03
Step

Installation & Testing

Certified engineers install the system and perform full safety and performance testing.
04
Step

Handover & Maintenance

We hand over the completed system and provide ongoing after-sales and maintenance services for long-term reliability.

Project Information

Project Name

Arabella Hotel

Project Type

Hospitality Project

Category

Unidome

Location

Kuwait

Al Fahel

About project

EEE Group supplied Unidome systems for four G+7 mixed-use commercial and residential buildings in Sharjah. The solution supported efficient floor spans, reduced concrete consumption, and enhanced overall structural performance while maintaining cost-effective and sustainable construction.

Features of Project

Massive concrete reduction: Reduces concrete usage by up to 20–30%, lowering carbon emissions dramatically.

Lightweight slab design: Creates stronger yet lighter slabs, reducing overall building load.

Eco-friendly recycled material: Void formers are produced from high-quality recycled plastic, supporting circular construction.

Cost-efficient construction: Less concrete, less steel, and faster installation reduce overall project costs.

Improved structural performance: Enhances load distribution and allows for longer spans with fewer columns.

Certified sustainability solution: Fully compliant with international green building standards

Working Process

01
Step

Design & Planning

We study project requirements and create a tailored elevator solution that fits the building’s needs.
02
Step

Engineering & Fabrication

Our team prepares the technical designs and oversees the manufacturing of all components to ensure quality.
03
Step

Installation & Testing

Certified engineers install the system and perform full safety and performance testing.
04
Step

Handover & Maintenance

We hand over the completed system and provide ongoing after-sales and maintenance services for long-term reliability.

Project Information

 

Project Name

Al Fahel

Project Type

Mixed-Use Commercial & Residential Project

Category

Unidome

Location

Jordan

Baniyas Car Showroom

About project

Completed the installation of one turntable for Baniyas Car Showroom, delivering accurate positioning, seamless integration, and efficient operational functionality.

Working Process

01
Step

Design & Planning

We study project requirements and create a tailored elevator solution that fits the building’s needs.
02
Step

Engineering & Fabrication

Our team prepares the technical designs and oversees the manufacturing of all components to ensure quality.
03
Step

Installation & Testing

Certified engineers install the system and perform full safety and performance testing.
04
Step

Handover & Maintenance

We hand over the completed system and provide ongoing after-sales and maintenance services for long-term reliability.

Project Information

Project Name

Baniyas Car Showroom

Project Type

Turntable

Category

Car Parking System and Solutions

Location

Abu Dhabi, UAE

Units

1 Unit

W Motors

About project

Completed the installation of two turntable units for W Motors, delivering accurate positioning, seamless integration, and efficient operational functionality.

Working Process

01
Step

Design & Planning

We study project requirements and create a tailored elevator solution that fits the building’s needs.
02
Step

Engineering & Fabrication

Our team prepares the technical designs and oversees the manufacturing of all components to ensure quality.
03
Step

Installation & Testing

Certified engineers install the system and perform full safety and performance testing.
04
Step

Handover & Maintenance

We hand over the completed system and provide ongoing after-sales and maintenance services for long-term reliability.

Project Information

 

Project Name

W Motors

Project Type

Turntable

Category

Car Parking System and Solutions

Location

Dubai, UAE

Sobha Creek Vistas Reserve

About project

EEE Group delivered high-capacity Shanghai Mitsubishi elevators for Sobha Creek Vistas Reserve, a high-rise residential project. The installation supports efficient vertical mobility, quiet operation, and long-term reliability, aligned with the project’s upscale living standards.

Features of Project

High-capacity system: 12 elevators designed to support smooth and efficient resident traffic throughout the building.

Smooth & quiet operation: Enhanced ride quality ensuring a calm and pleasant daily commute for residents.

Advanced safety technology: Equipped with the latest international safety standards.

Energy-efficient performance: Optimized systems to reduce power consumption.

Reliable for high usage: Reliable, long-life components designed for round-the-clock operation.

Elegant cabin finishes: Modern interiors complementing the luxury design of Marina Bay.

Working Process

01
Step

Design & Planning

We study project requirements and create a tailored elevator solution that fits the building’s needs.
02
Step

Engineering & Fabrication

Our team prepares the technical designs and oversees the manufacturing of all components to ensure quality.
03
Step

Installation & Testing

Certified engineers install the system and perform full safety and performance testing.
04
Step

Handover & Maintenance

We hand over the completed system and provide ongoing after-sales and maintenance services for long-term reliability.

Project Information

 

Client Name

PNC Investments

Category

Shanghai Mitsubishi Elevator

Consultant

PNC Architect

Contractors

Sobha Constructions

Location

MBR City, Dubai, UAE

Units / stops

12 units, 37 stops

SAAS Tower

About project

SAAS Tower is equipped with high-performance Shanghai Mitsubishi elevator systems, designed to support both hotel and hotel apartment operations. The installation ensures smooth, quiet, and efficient vertical transportation for guests, residents, and service staff, enhancing overall comfort and operational flow. Engineered for reliability and continuous use, the elevators contribute to a seamless hospitality experience while meeting the demands of mixed-use accommodation.

Features of Project



High-capacity system: 15 elevators designed to efficiently manage guest, resident, and service traffic throughout the property.

Smooth & quiet operation: Superior ride comfort ensuring a relaxed and uninterrupted stay for guests and residents.

Advanced safety technology: Equipped with the latest international safety standards.

Energy-efficient performance: Optimized systems to reduce power consumption.

Reliable for high usage: Durable, long-life components engineered for reliable 24/7 hospitality use.

Elegant cabin finishes: Modern interiors complementing the luxury design of Sonder.

Working Process

01
Step

Design & Planning

We study project requirements and create a tailored elevator solution that fits the building’s needs.
02
Step

Engineering & Fabrication

Our team prepares the technical designs and oversees the manufacturing of all components to ensure quality.
03
Step

Installation & Testing

Certified engineers install the system and perform full safety and performance testing.
04
Step

Handover & Maintenance

We hand over the completed system and provide ongoing after-sales and maintenance services for long-term reliability.

Project Information

Client Name

Kingston Holding International Limited LLC

Category

Shanghai Mitsubishi Elevator

Consultant

National Engineering Bureau

Contractors

Kele Contracting

Location

Business Bay, Dubai, UAE

Units / stops

15 units, 44 stops

Pearlz by Danube

About project

EEE Group successfully supplied and installed Shanghai Mitsubishi elevator systems for Pearlz by Danube, a residential project. The elevators provide smooth, safe, and efficient vertical transportation designed for long-term residential use.

Features of Project



High-capacity system: 6 elevators designed to support smooth and efficient resident traffic throughout the building.

Smooth & quiet operation: Enhanced ride quality ensuring a calm and pleasant daily commute for residents.

Advanced safety technology: Equipped with the latest international safety standards.

Energy-efficient performance: Optimized systems to reduce power consumption.

Reliable for high usage: Reliable, long-life components designed for round-the-clock operation.

Elegant cabin finishes: Modern interiors complementing the luxury design of Danube properties.

Working Process

01
Step

Design & Planning

We study project requirements and create a tailored elevator solution that fits the building’s needs.
02
Step

Engineering & Fabrication

Our team prepares the technical designs & oversees the manufacturing of all components to ensure quality.
03
Step

Installation & Testing

Certified engineers install the system and perform full safety and performance testing.
04
Step

Handover & Maintenance

We hand over the completed system and provide ongoing after-sales and maintenance services for long-term reliability.

Project Information

Client Name

Danube Properties

Category

Shanghai Mitsubishi Elevator

Consultant

EDMAC Engineering

Contractors

Prestige Construction

Location

Jebel Ali, Dubai, UAE

Units / stops

6 units, 13 stops

SOBHA One Park Avenue

About project

EEE Group installed eight Shanghai Mitsubishi elevator units, serving 28 stops to ensure smooth and efficient movement throughout One Park Avenue. This project highlights our ability to deliver reliable, high-quality vertical transportation that supports the comfort and daily flow of residents.

Features of Project

Efficient performance: Elevators designed to operate smoothly across all 28 floors.

Fast & comfortable travel: Reduced waiting times and consistent ride comfort.

Advanced safety technology: Equipped with modern protection and emergency systems.

Energy-efficient operation: Optimized systems to lower power consumption.

Built for long-term reliability: Durable components ideal for continuous residential use.

Modern cabin design: Sleek interiors that complement the building’s contemporary style.

Working Process

01
Step

Design & Planning

We study project requirements and create a tailored elevator solution that fits the building’s needs.
02
Step

Engineering & Fabrication

Our team prepares the technical designs and oversees the manufacturing of all components to ensure quality.
03
Step

Installation & Testing

Certified engineers install the system and perform full safety and performance testing.
04
Step

Handover & Maintenance

We hand over the completed system and provide ongoing after-sales and maintenance services for long-term reliability.

Project Information

 

Client Name

PNC Investment

Category

Shanghai Mitsubishi Elevator

Consultant

PNC Architects

Contractors

Sobha Contruction

Location

Sobha Hartland

Units / stops

8 units, 28 stops

St. Regis

About project

EEE Group delivered eighteen Shanghai Mitsubishi elevator units, serving 30 stops to support the luxury hospitality operations of St. Regis. As one of our signature high-end installations, this project ensures smooth, quiet, and reliable vertical mobility that matches the elegance and service standards of the St. Regis brand.

Features of Project

High-capacity system: 18 elevators engineered to handle continuous hotel traffic.

Smooth & quiet operation: Premium ride comfort suitable for luxury hospitality.

Advanced safety technology: Equipped with the latest international safety standards.

Energy-efficient performance: Optimized systems to reduce power consumption.

Reliable for high usage: Durable components designed for 24/7 hotel operation.

Elegant cabin finishes: Modern interiors complementing the luxury design of St. Regis.

Working Process

01
Step

Design & Planning

We study project requirements and create a tailored elevator solution that fits the building’s needs.
02
Step

Engineering & Fabrication

Our team prepares the technical designs and oversees the manufacturing of all components to ensure quality.
03
Step

Installation & Testing

Certified engineers install the system and perform full safety and performance testing.
04
Step

Handover & Maintenance

We hand over the completed system and provide ongoing after-sales and maintenance services for long-term reliability.

Project Information

 

Client Name

St. Regis

Category

Shanghai Mitsubishi Elevator

Consultant

Meinhardt

Contractors

Jiangsu Nanongliu Jian Construction

Location

Business Bay, Dubai, UAE

Units / stops

18 units, 30 stops

Skyz by Danube

About project

EEE Group supplied and installed nine Shanghai Mitsubishi elevator units, serving 44 stops with reliable high-rise performance. As one of our recent projects, this installation enhances vertical mobility across the entire tower, ensuring smooth, safe, and efficient transportation for all residents.

Features of Project

High-rise capability: Shanghai Mitsubishi elevators operating efficiently across 44 floors.

Smooth & fast travel: High-speed performance with reduced waiting times.

Advanced safety systems: Equipped with state-of-the-art safety and emergency features.

Energy-efficient operation: Modern technology designed to reduce power consumption.

Robust & durable build: Ideal for continuous residential traffic with long-term reliability.

Contemporary cabin design: Stylish interiors that match the modern architecture of Skyz by Danube.

Working Process

01
Step

Design & Planning

We study project requirements and create a tailored elevator solution that fits the building’s needs.
02
Step

Engineering & Fabrication

Our team prepares the technical designs and oversees the manufacturing of all components to ensure quality.
03
Step

Installation & Testing

Certified engineers install the system and perform full safety and performance testing.
04
Step

Handover & Maintenance

We hand over the completed system and provide ongoing after-sales and maintenance services for long-term reliability.

Project Information

 

Client Name

Danube Properties

Category

Shanghai Mitsubishi Elevator

Consultant

National Engineering Bureau

Contractors

NASRESCO Contracting

Location

Dubai land

Units / stops

9 units, 44 stops

Signature Tower by DAMAC

About project

EEE Group successfully delivered five high-rise Shanghai Mitsubishi elevator units, engineered to serve 50 stops with seamless performance. The installation supports the tower’s hospitality operations with smooth vertical mobility, high-speed travel, and long-term reliability, ensuring guests and residents enjoy a premium, efficient, and safe experience throughout the building.

Features of Project

High-rise performance: Elevators engineered to operate smoothly across 50 stops with consistent ride comfort.

Premium speed & efficiency: High-speed travel reducing waiting times for guests and residents.

Advanced safety systems: Equipped with state-of-the-art safety features meeting international standards.

Energy-efficient technology: Optimized motors and controls to minimize power consumption.

Durable & reliable design: Built for heavy daily usage in hospitality environments with minimal downtime.

Elegant cabin finishes: Modern interiors that complement the luxury aesthetics of Damac properties.

Working Process

01
Step

Design & Planning

We study project requirements and create a tailored elevator solution that fits the building’s needs.
02
Step

Engineering & Fabrication

Our team prepares the technical designs and oversees the manufacturing of all components to ensure quality.
03
Step

Installation & Testing

Certified engineers install the system and perform full safety and performance testing.
04
Step

Handover & Maintenance

We hand over the completed system and provide ongoing after-sales and maintenance services for long-term reliability.

Project Information

 

Client Name

Damac

Category

Shanghai Mitsubishi Elevator

Consultant

Zas / Pse

Contractors

Sun Engineering & Cont.

Location

Business Bay, Dubai, UAE

Units / stops

5 units, 50 stops

Marriott Hotel Apartments

About project

EEE Group delivered Shanghai Mitsubishi elevator systems for Marriott Hotel Apartments, a high-rise residential project. The elevators are designed to handle residential traffic efficiently, offering smooth operation, enhanced safety features, and long-term reliability for everyday use.

Features of Project



High-capacity system: 12 elevators designed to support smooth and efficient resident traffic throughout the building.

Smooth & quiet operation: Enhanced ride quality ensuring a calm and pleasant daily commute for residents.

Advanced safety technology: Equipped with the latest international safety standards.

Energy-efficient performance: Optimized systems to reduce power consumption.

Reliable for high usage: Reliable, long-life components designed for round-the-clock operation.

Elegant cabin finishes: Modern interiors complementing the luxury design of Marriott Properties.


Working Process

01
Step

Design & Planning

We study project requirements and create a tailored elevator solution that fits the building’s needs.
02
Step

Engineering & Fabrication

Our team prepares the technical designs & oversees the manufacturing of all components to ensure quality.
03
Step

Installation & Testing

Certified engineers install the system and perform full safety and performance testing.
04
Step

Handover & Maintenance

We hand over the completed system and provide ongoing after-sales and maintenance services for long-term reliability.

Project Information

Client Name

Marriott Group

Category

Shanghai Mitsubishi Elevator

Consultant

Emirates Innovation

Contractors

Jiangsu Nanongliu Jian Construction Group Co.

Location

Business Bay, Dubai, UAE

Units / stops

12 units, 36 stops

Saudi German Hospital

About project

Saudi German Hospital is equipped with advanced Shanghai Mitsubishi elevator systems, designed to meet the critical demands of a modern healthcare environment. The elevators support smooth, quiet, and reliable vertical transportation for patients, medical staff, and visitors, ensuring efficient circulation across all hospital floors. Engineered for safety, durability, and continuous operation, the system plays a vital role in supporting high patient volumes and uninterrupted hospital services.

Features of Project



High-capacity system: 9 elevators designed to efficiently manage continuous patient, staff, and visitor movement.

Smooth & quiet operation: Ensures patient comfort and minimal disturbance in sensitive healthcare environments.

Advanced safety technology: Fully compliant with the latest international healthcare and elevator safety standards.

Energy-efficient performance: Optimized systems to reduce power consumption.

Reliable for high usage: Heavy-duty components engineered for reliable 24/7 hospital use.

Elegant cabin finishes: Clean, modern finishes aligned with the high-quality standards of Saudi German Hospital.

Working Process

01
Step

Design & Planning

We study project requirements and create a tailored elevator solution that fits the building’s needs.
02
Step

Engineering & Fabrication

Our team prepares the technical designs and oversees the manufacturing of all components to ensure quality.
03
Step

Installation & Testing

Certified engineers install the system and perform full safety and performance testing.
04
Step

Handover & Maintenance

We hand over the completed system and provide ongoing after-sales and maintenance services for long-term reliability.

Project Information

Client Name

Emirates Healthcare Development

Category

Shanghai Mitsubishi Elevator

Consultant

Eng. Adnan Saffarini

Contractors

IHCC

Location

Al Barsha, Dubai, UAE

Units / stops

9 units, 11 stops

Al Husseini Towers

About project

Al Hussaini Towers is a prominent high-rise development in Amman, requiring a robust and high-capacity vertical transportation solution to support intensive daily use across multiple floors. The project called for proven technology capable of delivering consistent performance, smooth circulation, and long-term operational reliability.

Our scope included the delivery of 12 elevators from Shanghai Mitsubishi, serving 22 stops, ensuring efficient vertical movement and dependable service in a demanding high-rise environment.

Features of Project

High-capacity system design suited for tall building traffic patterns

Advanced ride comfort and smooth acceleration for frequent use

Proven technology selected for long-term durability

Reliable performance supporting continuous daily operation

Service-friendly configuration to support efficient maintenance

Working Process

01
Step

Design & Planning

We study project requirements and create a tailored elevator solution that fits the building’s needs.
02
Step

Engineering & Fabrication

Our team prepares the technical designs & oversees the manufacturing of all components to ensure quality.
03
Step

Installation & Testing

Certified engineers install the system and perform full safety and performance testing.
04
Step

Handover & Maintenance

We hand over the completed system and provide ongoing after-sales and maintenance services for long-term reliability.

Project Information

 

Client Name

Al Husseini Group

Category

Shanghai Mitsubishi Elevator

Location

Dubai, UAE

Units / stops

12 units, 22 stops

DAMAC Marina Bay

About project

EEE Group successfully delivered high-rise Shanghai Mitsubishi elevator systems for Marina Bay, Reem Island, a premium residential project. The elevators were engineered to serve multiple floors with smooth, quiet travel and optimized traffic flow, ensuring reliable daily operation, enhanced passenger comfort, and long-term performance for residents.

Features of Project



High-capacity system: 8 elevators designed to support smooth and efficient resident traffic throughout the building.

Smooth & quiet operation: Enhanced ride quality ensuring a calm and pleasant daily commute for residents.

Advanced safety technology: Equipped with the latest international safety standards.

Energy-efficient performance: Optimized systems to reduce power consumption.

Reliable for high usage: Reliable, long-life components designed for round-the-clock operation.

Elegant cabin finishes: Modern interiors complementing the luxury design of Marina Bay.

Working Process

01
Step

Design & Planning

We study project requirements and create a tailored elevator solution that fits the building’s needs.
02
Step

Engineering & Fabrication

Our team prepares the technical designs and oversees the manufacturing of all components to ensure quality.
03
Step

Installation & Testing

Certified engineers install the system and perform full safety and performance testing.
04
Step

Handover & Maintenance

We hand over the completed system and provide ongoing after-sales and maintenance services for long-term reliability.

Project Information

Client Name

DAMAC Properties

Category

Shanghai Mitsubishi Elevator

Consultant

ACG Architectural Cons. Group

Contractors

Al Shafar General Contracting

Location

Reem Island, Abu Dhabi, UAE

Units / stops

8 units, 28 stops

The One, JVC

About project

EEE Group supplied Shanghai Mitsubishi elevator saolutions for The One in JVC, a modern hospitality project. The installation supports high guest traffic with efficient vertical mobility, smooth performance, and reliable operation aligned with international hotel standards.

Features of Project



High-capacity system: 8 elevators designed to seamlessly manage peak hotel traffic and guest movement.

Smooth & quiet operation: Premium ride comfort suitable for luxury hospitality.

Advanced safety technology: Equipped with the latest international safety standards.

Energy-efficient performance:Optimized systems to reduce power consumption.

Reliable for high usage: Durable components designed for 24/7 hotel operation.

Elegant cabin finishes: Modern interiors complementing the luxury design of First Collection.

Working Process

01
Step

Design & Planning

We study project requirements and create a tailored elevator solution that fits the building’s needs.
02
Step

Engineering & Fabrication

Our team prepares the technical designs and oversees the manufacturing of all components to ensure quality.
03
Step

Installation & Testing

Certified engineers install the system and perform full safety and performance testing.
04
Step

Handover & Maintenance

We hand over the completed system and provide ongoing after-sales and maintenance services for long-term reliability.

Project Information

Client Name

Professional Choice Real Estate

Category

Shanghai Mitsubishi Elevator

Consultant

ECG Engineering Consultant

Contractors

China Railway 18th Bureau

Location

Business Bay, Dubai, UAE

Units / stops

8 units, 20 stops

DAMAC Oceanscape

About project

EEE Group installed advanced Shanghai Mitsubishi elevator units at Oceanscape, Reem Island, a high-rise residential development. The solution provides efficient vertical mobility, smooth ride quality, and dependable performance, supporting safe and comfortable movement throughout the building.

Features of Project



High-capacity system: 10 elevators designed to support smooth and efficient resident traffic throughout the building.

Smooth & quiet operation: Enhanced ride quality ensuring a calm and pleasant daily commute for residents.

Advanced safety technology: Equipped with the latest international safety standards.

Energy-efficient performance: Optimized systems to reduce power consumption.

Reliable for high usage: Reliable, long-life components designed for round-the-clock operation.

Elegant cabin finishes: Modern interiors complementing the luxury design of Oceanscape.

Working Process

01
Step

Design & Planning

We study project requirements and create a tailored elevator solution that fits the building’s needs.
02
Step

Engineering & Fabrication

Our team prepares the technical designs and oversees the manufacturing of all components to ensure quality.
03
Step

Installation & Testing

Certified engineers install the system and perform full safety and performance testing.
04
Step

Handover & Maintenance

We hand over the completed system and provide ongoing after-sales and maintenance services for long-term reliability.

Project Information

Client Name

DAMAC Properties

Category

Shanghai Mitsubishi Elevator

Consultant

Khatib Al Alami

Contractors

Al Shafar General Contracting

Location

Reem Island, Abu Dhabi, UAE

Units / stops

10 units, 31 stops

Sterling Tower

About project

EEE Group delivered Shanghai Mitsubishi elevator systems for The Sterling Tower, a high-rise residential project. The elevators are designed to handle residential traffic efficiently, offering smooth operation, enhanced safety features, and long-term reliability for everyday use.

Features of Project



High-capacity system: 8 elevators designed to support smooth, efficient movement for residents throughout the building.

Smooth & quiet operation: Enhanced ride comfort ensuring a calm, refined residential experience.

Advanced safety technology: Equipped with the latest international safety standards.

Energy-efficient performance: Optimized systems to reduce power consumption.

Reliable for high usage: Durable components engineered for continuous residential use, day and night.

Elegant cabin finishes: Modern interiors complementing the luxury design of Omniyat Properties

Working Process

01
Step

Design & Planning

We study project requirements and create a tailored elevator solution that fits the building’s needs.
02
Step

Engineering & Fabrication

Our team prepares the technical designs and oversees the manufacturing of all components to ensure quality.
03
Step

Installation & Testing

Certified engineers install the system and perform full safety and performance testing.
04
Step

Handover & Maintenance

We hand over the completed system and provide ongoing after-sales and maintenance services for long-term reliability.

Project Information

Client Name

OMNIYAT

Category

Shanghai Mitsubishi Elevator

Consultant

ARKIPLAN CONSULTANT

Contractors

SUN ENGINEERING

Location

Business Bay, Dubai, UAE

Units / stops

8 units, 28 stops

DAMAC Maison – Cour Jardin

About project

EEE Group delivered Shanghai Mitsubishi elevator systems for Cosmopolitan, a residential development. The installation ensures smooth operation, passenger safety, and reliable vertical mobility to support daily living requirements.

Features of Project

High-capacity system: 6 elevators engineered to handle continuous hotel traffic.

Smooth & quiet operation: Premium ride comfort suitable for luxury hospitality.

Advanced safety technology: Equipped with the latest international safety standards.

Energy-efficient performance: Optimized systems to reduce power consumption.

Reliable for high usage: Durable components designed for 24/7 hotel operation.

Elegant cabin finishes: Modern interiors complementing the luxury design of Damac Properties

Working Process

01
Step

Design & Planning

We study project requirements and create a tailored elevator solution that fits the building’s needs.
02
Step

Engineering & Fabrication

Our team prepares the technical designs and oversees the manufacturing of all components to ensure quality.
03
Step

Installation & Testing

Certified engineers install the system and perform full safety and performance testing.
04
Step

Handover & Maintenance

We hand over the completed system and provide ongoing after-sales and maintenance services for long-term reliability.

Project Information

 

Client Name

DAMAC

Category

Shanghai Mitsubishi Elevator

Consultant

Shadid Engineering

Location

Business Bay, Dubai, UAE

Units / stops

6 units, 23 stops

Tryp Hotel

About project

EEE Group successfully installed Shanghai Mitsubishi elevators at Tryp by Wyndham, an international hospitality project. The solution supports efficient guest circulation, smooth ride quality, and dependable operation for both guests and hotel services.

Features of Project



High-rise performance: Elevators engineered to operate smoothly across 30 stops with consistent ride comfort.

Premium speed & efficiency: High-speed travel reducing waiting times for guests and residents.

Advanced safety systems: Equipped with state-of-the-art safety features meeting international standards.

Energy-efficient technology: Optimized motors and controls to minimize power consumption.

Durable & reliable design: Built for heavy daily usage in hospitality environments with minimal downtime.

Elegant cabin finishes: Modern interiors that complement the luxury aesthetics of Tryp properties.

Working Process

01
Step

Design & Planning

We study project requirements and create a tailored elevator solution that fits the building’s needs.
02
Step

Engineering & Fabrication

Our team prepares the technical designs and oversees the manufacturing of all components to ensure quality.
03
Step

Installation & Testing

Certified engineers install the system and perform full safety and performance testing.
04
Step

Handover & Maintenance

We hand over the completed system and provide ongoing after-sales and maintenance services for long-term reliability.

Project Information

Client Name

Prime Owners Association Management Services LLC

Category

Shanghai Mitsubishi Elevator

Consultant

Al Hawra Engineering

Contractors

Location

Barsha Heights, Dubai, UAE

Units / stops

8 units, 30 stops

Sofia Avenue

About project

Sofia Avenue Mall in Jordan is equipped with comprehensive Shanghai Mitsubishi vertical transportation solutions, comprising seven passenger elevators serving eight stops and fourteen escalators. Designed to support high visitor volumes, the system ensures smooth circulation across retail levels while enhancing accessibility and overall shopper experience.

Features of Project



High-capacity retail mobility: Integrated elevator and escalator systems designed for efficient movement in a busy shopping environment.

Balanced vertical circulation: Seven elevators serving eight stops provide convenient access across all mall levels.

Extensive escalator network: Fourteen escalators support continuous and organized shopper flow.

Smooth and comfortable operation: Stable performance enhances visitor comfort throughout the mall.

Reliable long-term performance: Systems engineered to operate consistently under heavy daily retail traffic.

Working Process

01
Step

Design & Planning

We study project requirements and create a tailored elevator solution that fits the building’s needs.
02
Step

Engineering & Fabrication

Our team prepares the technical designs & oversees the manufacturing of all components to ensure quality.
03
Step

Installation & Testing

Certified engineers install the system and perform full safety and performance testing.
04
Step

Handover & Maintenance

We hand over the completed system and provide ongoing after-sales and maintenance services for long-term reliability.

Project Information

Category

Shanghai Mitsubishi Elevator

Location

Jordan

Units / stops

21 Units, 8 Stops

Project Status

Completed

Sameh Mall

About project

Sameh Mall is equipped with Shanghai Mitsubishi vertical transportation solutions, comprising five passenger elevators serving four stops and eight escalators. The system is designed to support smooth shopper movement and efficient circulation across retail levels, ensuring reliable operation and a comfortable visitor experience.

Features of Project



Optimized retail circulation: Elevators and escalators configured to support smooth movement across compact retail floors.

Efficient vertical access: Five elevators serving four stops ensure convenient access between shopping levels.

Continuous escalator operation: Eight escalators designed for steady shopper flow during daily retail activity.

Comfort-focused travel: Stable ride quality and controlled speed enhance the shopping experience.

Reliable daily performance: Systems engineered for consistent operation under regular retail traffic.

Working Process

01
Step

Design & Planning

We study project requirements and create a tailored elevator solution that fits the building’s needs.
02
Step

Engineering & Fabrication

Our team prepares the technical designs & oversees the manufacturing of all components to ensure quality.
03
Step

Installation & Testing

Certified engineers install the system and perform full safety and performance testing.
04
Step

Handover & Maintenance

We hand over the completed system and provide ongoing after-sales and maintenance services for long-term reliability.

Project Information

Client Name

Hjazi & Partner

Consultant

Khalid Al Khaldi

Category

Shanghai Mitsubishi Elevator

Location

Jordan

Units / stops

13 Units, 4 Stops

Project Status

Completed

German Jordanian University

About project

German Jordanian University is equipped with Shanghai Mitsubishi elevator systems, comprising five passenger elevators serving five stops, designed to support daily academic life across campus facilities. The elevators provide dependable vertical access for students, faculty, and staff, contributing to smooth campus circulation while maintaining a safe, calm, and orderly learning environment.

Features of Project



Campus-oriented mobility: Elevator solutions designed to support academic buildings with steady, predictable daily usage.

Balanced vertical access: Five elevators serving five stops ensure convenient movement between educational floors.

Quiet operational performance: Engineered to operate smoothly with minimal noise, supporting a focused learning atmosphere.

Student-safe design: Advanced safety and emergency features suitable for high student occupancy environments.

Energy-conscious operation: Systems optimized for efficient power usage within institutional facilities.

Working Process

01
Step

Design & Planning

We study project requirements and create a tailored elevator solution that fits the building’s needs.
02
Step

Engineering & Fabrication

Our team prepares the technical designs & oversees the manufacturing of all components to ensure quality.
03
Step

Installation & Testing

Certified engineers install the system and perform full safety and performance testing.
04
Step

Handover & Maintenance

We hand over the completed system and provide ongoing after-sales and maintenance services for long-term reliability.

Project Information

Client Name

German Jordan University

Consultant

Arab DAR Engineering Co.

Category

Shanghai Mitsubishi Elevator

Location

Jordan

Units / stops

5 Units, 5 Stops

Project Status

Completed

Istiklal Mall

About project

Istiqlal Mall is equipped with Shanghai Mitsubishi escalator systems, comprising 10 escalators designed to support smooth and continuous shopper movement across retail levels. The installation enhances accessibility and circulation efficiency while ensuring reliable performance suited to daily mall operations.

Features of Project



Seamless shopper flow: Escalators designed to maintain steady and organized movement between retail floors.

Continuous-duty operation: Engineered for consistent performance in high-usage retail environments.

Passenger comfort: Smooth acceleration and stable operation enhance the visitor experience.

Abdvanced safety design: Integrated safety features to ensure secure use for all mall visitors.

Long-term reliability: Durable construction supporting dependable operation over time.

Working Process

01
Step

Design & Planning

We study project requirements and create a tailored elevator solution that fits the building’s needs.
02
Step

Engineering & Fabrication

Our team prepares the technical designs & oversees the manufacturing of all components to ensure quality.
03
Step

Installation & Testing

Certified engineers install the system and perform full safety and performance testing.
04
Step

Handover & Maintenance

We hand over the completed system and provide ongoing after-sales and maintenance services for long-term reliability.

Project Information

Client Name

Khalid Abu Hassan

Consultant

Munir Hajiri & Associate

Category

Shanghai Mitsubishi Elevator

Location

Jordan

Units / stops

10 Units

Project Status

Completed

Irbid City Centre

About project

Irbid City Centre is equipped with comprehensive Shanghai Mitsubishi vertical transportation solutions, comprising 10 passenger elevators serving 7 stops, along with 31 escalators supporting large-scale shopper circulation. Designed for high visitor volumes, the system ensures smooth, efficient, and reliable movement across all retail levels, enhancing accessibility and overall customer experience throughout the mall.

Features of Project



Large-scale retail mobility: Integrated elevator and escalator systems designed to support one of the region’s busiest shopping destinations.

High-capacity passenger movement: Ten elevators serving seven stops ensure balanced and efficient vertical circulation.

Extensive escalator network: Thirty-one escalators engineered for continuous operation and smooth shopper flow across multiple levels.

Comfortable and stable operation: Consistent ride quality and controlled speed enhance visitor comfort during peak periods.

Advanced safety standards: Modern safety and emergency systems ensure secure operation for all users.

Built for heavy-duty use: Durable components designed to withstand intensive daily traffic with long-term reliability.

Working Process

01
Step

Design & Planning

We study project requirements and create a tailored elevator solution that fits the building’s needs.
02
Step

Engineering & Fabrication

Our team prepares the technical designs & oversees the manufacturing of all components to ensure quality.
03
Step

Installation & Testing

Certified engineers install the system and perform full safety and performance testing.
04
Step

Handover & Maintenance

We hand over the completed system and provide ongoing after-sales and maintenance services for long-term reliability.

Project Information

Client Name

Khalid Abu Hassan

Consultant

Munir Hajiri & Associate

Category

Shanghai Mitsubishi Elevator

Location

Jordan

Units / stops

41 Units

Project Status

Completed

Pavilion Mall

About project

Pavilion Mall in Jordan is equipped with Shanghai Mitsubishi vertical transportation solutions, comprising four passenger elevators serving seven stops, along with twelve escalators supporting continuous shopper movement. Designed to handle high daily footfall, the system ensures smooth, efficient, and reliable circulation across all retail levels, enhancing accessibility and overall visitor experience.

Features of Project

Integrated retail mobility: Combination of elevators and escalators designed to support seamless vertical and horizontal movement throughout the mall.

Efficient passenger flow: Four elevators serving seven stops ensure balanced circulation between retail floors.

High-capacity escalator system: Twelve escalators engineered for continuous operation in high-traffic retail environments.

Smooth and comfortable operation: Stable ride quality and consistent speed enhance shopper comfort during peak hours.

Advanced safety systems: Equipped with modern safety and emergency features to ensure secure operation for all visitors.

Durable, long-term performance: Robust components designed to withstand heavy daily usage while maintaining reliability.

Working Process

01
Step

Design & Planning

We study project requirements and create a tailored elevator solution that fits the building’s needs.
02
Step

Engineering & Fabrication

Our team prepares the technical designs & oversees the manufacturing of all components to ensure quality.
03
Step

Installation & Testing

Certified engineers install the system and perform full safety and performance testing.
04
Step

Handover & Maintenance

We hand over the completed system and provide ongoing after-sales and maintenance services for long-term reliability.

Project Information

 

Client Name

Abdulsatar Abu Hassan

Category

Shanghai Mitsubishi Elevator

Location

Jordan

Units / stops

16 Units

Project Status

Completed

Arab Bank

About project

Al Hussaini Towers is a prominent high-rise development in Amman, requiring a robust and high-capacity vertical transportation solution to support intensive daily use across multiple floors. The project called for proven technology capable of delivering consistent performance, smooth circulation, and long-term operational reliability.

Our scope included the delivery of 12 elevators from Shanghai Mitsubishi, serving 22 stops, ensuring efficient vertical movement and dependable service in a demanding high-rise environment.

Features of Project



Corporate-grade performance: Two elevator units engineered to support consistent daily use within a banking headquarters.

Efficient vertical access: Serving 12 stops with smooth operation to ensure efficient movement between office levels.

Quiet and comfortable travel: Reduced noise and vibration to maintain a calm, professional atmosphere.

Advanced safety systems: Equipped with modern safety and emergency features aligned with international standards.

Reliable long-term operation: Durable components designed for continuous use and dependable performance.

Professional cabin design: Clean, refined interiors suited to a corporate and financial institution environment.

Working Process

01
Step

Design & Planning

We study project requirements and create a tailored elevator solution that fits the building’s needs.
02
Step

Engineering & Fabrication

Our team prepares the technical designs & oversees the manufacturing of all components to ensure quality.
03
Step

Installation & Testing

Certified engineers install the system and perform full safety and performance testing.
04
Step

Handover & Maintenance

We hand over the completed system and provide ongoing after-sales and maintenance services for long-term reliability.

Project Information

Client Name

Arab Bank

Category

Shanghai Mitsubishi Elevator

Location

Dubai, UAE

Units / stops

2 units, 12 stops

Project Status

Completed

Emmar Towers – A | B | C

About project

Arab Bank in Jordan is equipped with Shanghai Mitsubishi elevator systems, comprising two passenger lifts serving 12 stops. Designed to meet the operational needs of a major banking institution, the elevators deliver smooth, reliable, and efficient vertical transportation for staff and visitors. The installation supports daily corporate operations with a focus on safety, comfort, and long-term performance within a professional working environment.

Features of Project



Efficient office circulation: Fourteen elevators configured to support daily movement across multiple floors.

Smooth operational flow: Stable ride quality ensures comfortable and predictable vertical travel.

Advanced safety standards: Modern safety and emergency systems supporting secure daily use.

Reliable long-term operation: Systems engineered for durability and consistent performance in a commercial environment.

Working Process

01
Step

Design & Planning

We study project requirements and create a tailored elevator solution that fits the building’s needs.
02
Step

Engineering & Fabrication

Our team prepares the technical designs & oversees the manufacturing of all components to ensure quality.
03
Step

Installation & Testing

Certified engineers install the system and perform full safety and performance testing.
04
Step

Handover & Maintenance

We hand over the completed system and provide ongoing after-sales and maintenance services for long-term reliability.

Project Information

Client Name

Emaar

Category

Shanghai Mitsubishi Elevator

Location

Jordan

Units / stops

14 units, 121 stops, 1 escalator

Project Status

Completed

Daman Insurance

About project

EEE Group installed Shanghai Mitsubishi elevator systems at Daman Insurance, a commercial office project. The elevators support efficient staff movement, safe daily operation, and long-term performance within a professional corporate environment.

Features of Project

High-capacity system: 9 elevators designed to support smooth and efficient resident traffic throughout the building.

Smooth & quiet operation: Enhanced ride quality ensuring a calm and pleasant daily commute for residents.

Advanced safety technology: Equipped with the latest international safety standards.

Energy-efficient performance: Optimized systems to reduce power consumption.

Reliable for high usage: Reliable, long-life components designed for round-the-clock operation.

Elegant cabin finishes: Modern interiors complementing the luxury design of Marriott Properties.


Working Process

01
Step

Design & Planning

We study project requirements and create a tailored elevator solution that fits the building’s needs.
02
Step

Engineering & Fabrication

Our team prepares the technical designs & oversees the manufacturing of all components to ensure quality.
03
Step

Installation & Testing

Certified engineers install the system and perform full safety and performance testing.
04
Step

Handover & Maintenance

We hand over the completed system and provide ongoing after-sales and maintenance services for long-term reliability.

Project Information

 

Client Name

Finance House

Category

Shanghai Mitsubishi Elevator

Consultant

ACG

Contractors

 

Location

Abu Dhabi, UAE

Units / stops

9 units, 24 stops

Meyan Mall

About project

Shanghai Mitsubishi supplied four passenger elevator units serving six stops for Meyan Mall, a contemporary commercial retail destination. The elevators were designed to support smooth shopper circulation with reliable performance and comfortable travel. Integrated seamlessly within the mall’s architectural layout, the system enhances accessibility, efficiency, and the overall visitor experience while supporting daily retail operations.

Features of Project



Efficient retail circulation: Four elevator units serving six stops, designed to support smooth movement of shoppers and visitors across mall levels.

Comfortable passenger travel: Stable, vibration-free ride quality to ensure a pleasant experience during peak shopping hours.

Reliable daily operation: Systems engineered for continuous use in a high-traffic retail environment.

Advanced safety features: Equipped with modern safety and emergency systems to ensure secure operation for all users.

Energy-efficient performance: Optimized drive and control technology designed to reduce power consumption while maintaining performance.

Architectural integration: Elevator cabins and entrances designed to blend seamlessly with the mall’s interior design and public spaces.

Working Process

01
Step

Design & Planning

We study project requirements and create a tailored elevator solution that fits the building’s needs.
02
Step

Engineering & Fabrication

Our team prepares the technical designs & oversees the manufacturing of all components to ensure quality.
03
Step

Installation & Testing

Certified engineers install the system and perform full safety and performance testing.
04
Step

Handover & Maintenance

We hand over the completed system and provide ongoing after-sales and maintenance services for long-term reliability.

Project Information

Client Name

Al Waleed Real Estate

Category

Shanghai Mitsubishi Elevator

Consultant

Al Asri Engg. Consultant

Contractors

Sam Building Contractors

Location

Jumeirah, Dubai, UAE

Units / stops

4 units, 6 stops

Project Status

Completed

Shaha Towers

About project

EEE Group successfully delivered nine high-rise Shanghai Mitsubishi elevator units for Al Shaha Tower in Sharjah, a commercial high-rise project designed to serve 38 stops with smooth and efficient vertical mobility. The installation supports high daily traffic with reliable performance, optimized traffic handling, and advanced safety features, ensuring consistent operation and long-term durability for occupants and visitors.

Features of Project

High-capacity system: 12 elevators designed to support smooth and efficient resident traffic throughout the building.

Smooth & quiet operation: Enhanced ride quality ensuring a calm and pleasant daily commute for residents.

Advanced safety technology: Equipped with the latest international safety standards.

Energy-efficient performance: Optimized systems to reduce power consumption.

Reliable for high usage: Reliable, long-life components designed for round-the-clock operation.

Elegant cabin finishes: Modern interiors complementing the luxury design of Marriott Properties.


Working Process

01
Step

Design & Planning

We study project requirements and create a tailored elevator solution that fits the building’s needs.
02
Step

Engineering & Fabrication

Our team prepares the technical designs & oversees the manufacturing of all components to ensure quality.
03
Step

Installation & Testing

Certified engineers install the system and perform full safety and performance testing.
04
Step

Handover & Maintenance

We hand over the completed system and provide ongoing after-sales and maintenance services for long-term reliability.

Project Information

 

Client Name

Majid Ohali

Category

Shanghai Mitsubishi Elevator

Consultant

Private

Contractors

 

Location

Sharjah, UAE

Units / stops

9 units, 38 stops

DDF HQ Breakroom

About project

To cater to high foot-traffic staff areas, we designed and installed indoor smoking cabins that maximise efficiency while occupying minimal floor space.

Features of Project



Space-saving cabin design

Automated sensors

High-capacity filtration System

Multi-stage HEPA + activated carbon filtration

Working Process

01
Step

Site Visit

The site visit includes a detailed location evaluation to assess room ventilation, identify fresh-air supply points, and determine the optimal placement for the filtration or smoking cabin system.
02
Step

Order and production

Order and production involve confirming all technical specifications, initiating customised fabrication of the unit, and coordinating component assembly to ensure the final system meets performance and quality standards
03
Step

Delivery, Testing & Installation

Delivery, installation, and testing include transporting the completed unit to site, executing a precise and safe installation, integrating electrical and ventilation connections, and conducting full operational tests to verify airflow performance, filtration efficiency, and safety compliance.
04
Step

Service Maintenance

Service maintenance includes scheduled inspections, filter replacements if due

Project Information

Client Name

Dubai Duty Free

Category

QleanAir

Location

UAE

Units

2 SF Square Units

Smoking Cabin in DXB ATCT

About project

To cater to high foot-traffic staff areas, we designed and installed indoor smoking cabins that maximise efficiency while occupying minimal floor space.

Features of Project

Space-saving cabin design

Automated sensors

High-capacity filtration System

Multi-stage HEPA + activated carbon filtration

Working Process

01
Step

Site Visit

The site visit includes a detailed location evaluation to assess room ventilation, identify fresh-air supply points, and determine the optimal placement for the filtration or smoking cabin system.
02
Step

Order and production

Order and production involve confirming all technical specifications, initiating customised fabrication of the unit, and coordinating component assembly to ensure the final system meets performance and quality standards
03
Step

Delivery, Testing & Installation

Delivery, installation, and testing include transporting the completed unit to site, executing a precise and safe installation, integrating electrical and ventilation connections, and conducting full operational tests to verify airflow performance, filtration efficiency, and safety compliance.
04
Step

Service Maintenance

Service maintenance includes scheduled inspections, filter replacements if due

Project Information

 

Client Name

Dubai Air Navigation Services (DANS)

Category

QleanAir

Location

UAE

Units

1 Unit of Outdoor Smoking Cabin

Private Property

About project

Titan Car park solutions installed a unit in a private property in London, UK.

Working Process

01
Step

Design & Planning

We study project requirements and create a tailored elevator solution that fits the building’s needs.
02
Step

Engineering & Fabrication

Our team prepares the technical designs and oversees the manufacturing of all components to ensure quality.
03
Step

Installation & Testing

Certified engineers install the system and perform full safety and performance testing.
04
Step

Handover & Maintenance

We hand over the completed system and provide ongoing after-sales and maintenance services for long-term reliability.

Project Information

Project Name

Private Property

Category

Car Parking System and Solutions

Location

United KIngdom

Embassy Gardens

About project

We have installed 81 Tri park system in the Embassy Gardens project in London for Ballymore Group

Working Process

01
Step

Design & Planning

We study project requirements and create a tailored elevator solution that fits the building’s needs.
02
Step

Engineering & Fabrication

Our team prepares the technical designs and oversees the manufacturing of all components to ensure quality.
03
Step

Installation & Testing

Certified engineers install the system and perform full safety and performance testing.
04
Step

Handover & Maintenance

We hand over the completed system and provide ongoing after-sales and maintenance services for long-term reliability.

Project Information

Project Name

Embassy Garden

Project Type

Tri-Park System

Category

Car Parking Sytem and Solutions

Location

United Kingdom

Units

81 units

Wembley & Tottenham Hotspur – Retractable Seating

About project

ARX has engineered and delivered some of the world’s most iconic kinetic architecture projects. In 2019, the company marked two major milestones in the field with the debut of the retractable dividing pitch at Tottenham Hotspur Stadium and the concertina roof for No.1 Court at Wimbledon.

Beyond roofs and playing surfaces, ARX also transforms how spaces are used. Through retractable seating and terrace solutions, ARX works closely with architects to create flexible, high-value environments, as demonstrated at Wembley Stadium, Tottenham Hotspur Stadium, and Kai Tak Sports Park.

Features of Project



Hydraulically pivoting seating terraces engineered for multi-use stadiums (e.g., Wembley, Tottenham Hotspur) to maximise usable floor space.

Around 800 seats swing up on hydraulic mechanisms to reveal a flat, practical surface for events.

Hydraulic power system with eighteen large cylinders and control packs hidden under the steel frame for reliable motion.

Enables flexible venue configurations, such as creating extra concert space or improved access for large vehicles.

Fit-for-purpose design and engineering, covering mechanical and electrical design through installation and commissioning.

Focus on safety and simplicity, with control systems and mechanical design built to minimise complexity and maintenance.

Working Process

01
Step

Design & Planning

We study project requirements and create a tailored elevator solution that fits the building’s needs.
02
Step

Engineering & Fabrication

Our team prepares the technical designs and oversees the manufacturing of all components to ensure quality.
03
Step

Installation & Testing

Certified engineers install the system and perform full safety and performance testing.
04
Step

Handover & Maintenance

We hand over the completed system and provide ongoing after-sales and maintenance services for long-term reliability.

Project Information

Project Name

Wembley & Tottenham Hotspur: Retractable Seating

Project Type

Retractable Seating

Category

ARX

Location

United KIngdom

Tottenham Hotspur FC Dividing Football Pitch

About project

ARX engineered a world-first solution that splits the real grass Premier League pitch into three sections before rolling it away into a storage area beneath the South Stand. The 10,000-tonne pitch takes just 25 minutes to retract.

In addition, the entire touchline, pitch surround and player tunnel ramps rise and fall through a height of 1.65m to meet the different levels of the grass and synthetic playing surfaces.

Features of Project



World-first retractable pitch system consisting of three massive natural-grass trays that divide and retract to enable true multi-use stadium functionality.

Rapid transformation capability, with the full pitch conversion completed in approximately 25 minutes, allowing seamless switching between football, NFL, and major events.

Heavy-duty engineering at unprecedented scale, involving over 10,000 tonnes of moving structure powered by electric motors, hydraulic jacks, and custom steel wheels.

Precision-controlled movement systems, using electric motors for longitudinal motion and hydraulics for lateral movement, flaps, and pitch surround adjustments.

Fully integrated stadium infrastructure, including irrigation, drainage, heating, grow lighting systems, player tunnels, pitch surrounds, and retractable seating access.

esigned for long-term reliability and safety, featuring PLC-controlled operations, extensive testing, and a projected 25-year operational lifespan.

Working Process

01
Step

Design & Planning

We study project requirements and create a tailored elevator solution that fits the building’s needs.
02
Step

Engineering & Fabrication

Our team prepares the technical designs and oversees the manufacturing of all components to ensure quality.
03
Step

Installation & Testing

Certified engineers install the system and perform full safety and performance testing.
04
Step

Handover & Maintenance

We hand over the completed system and provide ongoing after-sales and maintenance services for long-term reliability.

Project Information

Project Name

Tottenham Hotspur FC Dividing Football Pitch

Project Type

Retractable Dividing Football Pitch

Category

ARX

Location

United KIngdom

Marriott Hotel – Petra

About project

Marriott Hotel in Jordan is equipped with Shanghai Mitsubishi elevator systems, comprising two passenger elevators serving seven stops. Designed to support hotel operations, the elevators provide smooth and quiet vertical transportation for guests and staff, ensuring efficient movement between floors while maintaining the comfort and service standards expected in an international hospitality environment.

Features of Project

Hospitality-oriented design: Elevator systems tailored to guest comfort and smooth hotel operations.

Efficient guest circulation: Two elevators serving seven stops ensure convenient access across hotel floors.

Quiet ride performance: Low-noise operation supports a calm and comfortable guest experience.

Reliable daily service: Engineered for continuous operation in a busy hotel environment.

Refined interior finishes: Cabin aesthetics designed to complement the hotel’s interior design.

Working Process

01
Step

Design & Planning

We study project requirements and create a tailored elevator solution that fits the building’s needs.
02
Step

Engineering & Fabrication

Our team prepares the technical designs & oversees the manufacturing of all components to ensure quality.
03
Step

Installation & Testing

Certified engineers install the system and perform full safety and performance testing.
04
Step

Handover & Maintenance

We hand over the completed system and provide ongoing after-sales and maintenance services for long-term reliability.

Project Information

 

Client Name

Marriott

Category

Shanghai Mitsubishi Elevator

Location

Jordan

Units / stops

2 Units, 7 Stops

Project Status

Completed

Valmont

About project

Titan delivered a specialized industrial lift solution for the Valmont manufacturing facility in Dubai. Designed for factory operations, the lift supports efficient vertical transportation within an industrial environment, emphasizing robustness, safety, and consistent performance under demanding operational conditions.

Features of Project



High-load handling capability: Lift engineered to transport heavy goods and materials efficiently across multiple factory levels.

Reliable operational flow: Designed for frequent start–stop cycles, ensuring smooth and consistent movement during continuous daily operations.

Industrial-grade safety systems: Equipped with reinforced safety mechanisms and emergency features suitable for factory environments.

Energy-efficient performance: Optimized drive and control systems to support efficient operation while managing high usage demands.

Robust construction: Heavy-duty components built to withstand demanding industrial conditions and long-term operational loads.

Functional cabin design: Practical, durable cabin finishes designed for easy maintenance and safe handling of goods and equipment.

Working Process

01
Step

Design & Planning

We study project requirements and create a tailored elevator solution that fits the building’s needs.
02
Step

Engineering & Fabrication

Our team prepares the technical designs and oversees the manufacturing of all components to ensure quality.
03
Step

Installation & Testing

Certified engineers install the system and perform full safety and performance testing.
04
Step

Handover & Maintenance

We hand over the completed system and provide ongoing after-sales and maintenance services for long-term reliability.

Project Information

Client Name

Valmont Middle East FZE

Project Type

Industrial / Factory Lift Project

Category

Titan New Lifts

Consultant

Architectural Corner

Contractor

City Diamond

Location

Dubai

Units / stops

1 units, 2 stops

One Za’abeel

About project

Titan delivered a truly unique and non-conventional lift experience at ONE ZA’ABEEL, featuring bespoke “couch lifts” designed as moving lounges rather than traditional elevators. Guests are seated comfortably in a lounge setting, enjoying coffee and panoramic views while the lift smoothly transports them between floors. This project redefines vertical mobility as a luxury experience, seamlessly blending hospitality, design, and innovation.

Features of Project



High-load handling capability: Lift engineered to transport heavy goods and materials efficiently across multiple factory levels.

Smooth, panoramic journey: Carefully engineered motion ensures a calm, seamless ride that enhances enjoyment of the surrounding views.

Discreet safety integration: Advanced safety and emergency systems are fully integrated without compromising the open, lounge-style design.

Silent and efficient operation: Precision technology minimizes noise and vibration, preserving a quiet and luxurious atmosphere.

Comfort-driven construction: Systems engineered to maintain stability and ride comfort, even with extended dwell times for viewing and leisure.

Bespoke lounge interiors: Custom seating, refined finishes, and ambient lighting create a premium setting that complements the surrounding architecture.

Working Process

01
Step

Design & Planning

We study project requirements and create a tailored elevator solution that fits the building’s needs.
02
Step

Engineering & Fabrication

Our team prepares the technical designs and oversees the manufacturing of all components to ensure quality.
03
Step

Installation & Testing

Certified engineers install the system and perform full safety and performance testing.
04
Step

Handover & Maintenance

We hand over the completed system and provide ongoing after-sales and maintenance services for long-term reliability.

Project Information

Client Name

ONE ZA’ABEEL LLC

Project Type

Ultra-Luxury Bespoke Experience Lifts

Category

Titan New Lifts

Consultant

WSP

Contractor

Alec

Location

Dubai

Units / stops

3 units, 4 stops

Befit

About project

Titan supplied a dedicated service lift solution for Befit, designed specifically to support operational and back-of-house requirements. The lift ensures reliable material and service movement, focusing on durability, efficiency, and safe daily operation.

Features of Project



Dedicated service functionality: Lift designed exclusively for back-of-house operations, supporting staff and service movement without impacting public areas.

Reliable material transport: Engineered to handle daily movement of equipment, supplies, and operational materials efficiently.

Heavy-duty performance: Robust components built to withstand frequent use and demanding service cycles.

Enhanced safety systems: Equipped with industrial safety and emergency features to ensure secure operation during continuous daily use.

Operational efficiency: Optimized control systems reduce downtime and support smooth, dependable service flow.

Working Process

01
Step

Design & Planning

We study project requirements and create a tailored elevator solution that fits the building’s needs.
02
Step

Engineering & Fabrication

Our team prepares the technical designs and oversees the manufacturing of all components to ensure quality.
03
Step

Installation & Testing

Certified engineers install the system and perform full safety and performance testing.
04
Step

Handover & Maintenance

We hand over the completed system and provide ongoing after-sales and maintenance services for long-term reliability.

Project Information

Client Name

Al Khayyat Investment

Project Type

Service Lift Project

Category

Titan New Lifts

Location

Dubai

Units / stops

1 units, 3 stops

Sobha One

About project

For the Sobha One master development, Unifill solutions contributed to streamlined construction across multiple structures. The system supported consistency, efficiency, and structural reliability at scale.

Features of Project



Massive concrete reduction: Reduces concrete usage by up to 20–30%, lowering carbon emissions dramatically.

Lightweight slab design: Creates stronger yet lighter slabs, reducing overall building load.

Eco-friendly recycled material: Void formers are produced from high-quality recycled plastic, supporting circular construction.

Cost-efficient construction: Less concrete, less steel, and faster installation reduce overall project costs.

Improved structural performance: Enhances load distribution and allows for longer spans with fewer columns.

Certified sustainability solution: Fully compliant with international green building standards

Working Process

01
Step

Design & Planning

We study project requirements and create a tailored elevator solution that fits the building’s needs.
02
Step

Engineering & Fabrication

Our team prepares the technical designs and oversees the manufacturing of all components to ensure quality.
03
Step

Installation & Testing

Certified engineers install the system and perform full safety and performance testing.
04
Step

Handover & Maintenance

We hand over the completed system and provide ongoing after-sales and maintenance services for long-term reliability.

Project Information

Project Name

Sobha One

Category

Unifill

Location

United Arab Emirates

Sobha Riverside Crescent

About project

Unifill solutions at Sobha Riverside Crescent supported waterfront residential construction by optimizing fill efficiency and structural performance, contributing to smooth execution and long-term durability.

Features of Project



Massive concrete reduction: Reduces concrete usage by up to 20–30%, lowering carbon emissions dramatically.

Lightweight slab design: Creates stronger yet lighter slabs, reducing overall building load.

Eco-friendly recycled material: Void formers are produced from high-quality recycled plastic, supporting circular construction.

Cost-efficient construction: Less concrete, less steel, and faster installation reduce overall project costs.

Improved structural performance: Enhances load distribution and allows for longer spans with fewer columns.

Certified sustainability solution: Fully compliant with international green building standards

Working Process

01
Step

Design & Planning

We study project requirements and create a tailored elevator solution that fits the building’s needs.
02
Step

Engineering & Fabrication

Our team prepares the technical designs and oversees the manufacturing of all components to ensure quality.
03
Step

Installation & Testing

Certified engineers install the system and perform full safety and performance testing.
04
Step

Handover & Maintenance

We hand over the completed system and provide ongoing after-sales and maintenance services for long-term reliability.

Project Information

Project Name

Sobha Riverside Crescent

Category

Unifill

Location

United Arab Emirates

Sobha Skyscape

About project

For Sobha Skyscape, Unifill played a role in supp∆orting vertical construction efficiency through lightweight fill solutions, aligning with the project’s modern architectural vision and engineering requirements.

Features of Project



Massive concrete reduction: Reduces concrete usage by up to 20–30%, lowering carbon emissions dramatically.

Lightweight slab design: Creates stronger yet lighter slabs, reducing overall building load.

Eco-friendly recycled material: Void formers are produced from high-quality recycled plastic, supporting circular construction.

Cost-efficient construction: Less concrete, less steel, and faster installation reduce overall project costs.

Improved structural performance: Enhances load distribution and allows for longer spans with fewer columns.

Certified sustainability solution: Fully compliant with international green building standards

Working Process

01
Step

Design & Planning

We study project requirements and create a tailored elevator solution that fits the building’s needs.
02
Step

Engineering & Fabrication

Our team prepares the technical designs and oversees the manufacturing of all components to ensure quality.
03
Step

Installation & Testing

Certified engineers install the system and perform full safety and performance testing.
04
Step

Handover & Maintenance

We hand over the completed system and provide ongoing after-sales and maintenance services for long-term reliability.

Project Information

Project Name

Sobha Skyscape

Category

Unifill

Location

United Arab Emirates

Pixel

About project

Unifill solutions were implemented at the Pixels development in Kuwait to support efficient construction and structural performance. The system contributed to optimized filling applications while meeting regional construction standards.

Features of Project



Massive concrete reduction: Reduces concrete usage by up to 20–30%, lowering carbon emissions dramatically.

Lightweight slab design: Creates stronger yet lighter slabs, reducing overall building load.

Eco-friendly recycled material: Void formers are produced from high-quality recycled plastic, supporting circular construction.

Cost-efficient construction: Less concrete, less steel, and faster installation reduce overall project costs.

Improved structural performance: Enhances load distribution and allows for longer spans with fewer columns.

Certified sustainability solution: Fully compliant with international green building standards

Working Process

01
Step

Design & Planning

We study project requirements and create a tailored elevator solution that fits the building’s needs.
02
Step

Engineering & Fabrication

Our team prepares the technical designs and oversees the manufacturing of all components to ensure quality.
03
Step

Installation & Testing

Certified engineers install the system and perform full safety and performance testing.
04
Step

Handover & Maintenance

We hand over the completed system and provide ongoing after-sales and maintenance services for long-term reliability.

Project Information

Project Name

Pixels

Category

Unifill

Location

Kuwait

Sobha Estates Project

About project

Across multiple Sobha estate developments, Unifill solutions were adopted to support consistent construction standards. The system enabled efficient execution while maintaining reliability across diverse project typologies.

Features of Project



Massive concrete reduction: Reduces concrete usage by up to 20–30%, lowering carbon emissions dramatically.

Lightweight slab design: Creates stronger yet lighter slabs, reducing overall building load.

Eco-friendly recycled material: Void formers are produced from high-quality recycled plastic, supporting circular construction.

Cost-efficient construction: Less concrete, less steel, and faster installation reduce overall project costs.

Improved structural performance: Enhances load distribution and allows for longer spans with fewer columns.

Certified sustainability solution: Fully compliant with international green building standards

Working Process

01
Step

Design & Planning

We study project requirements and create a tailored elevator solution that fits the building’s needs.
02
Step

Engineering & Fabrication

Our team prepares the technical designs and oversees the manufacturing of all components to ensure quality.
03
Step

Installation & Testing

Certified engineers install the system and perform full safety and performance testing.
04
Step

Handover & Maintenance

We hand over the completed system and provide ongoing after-sales and maintenance services for long-term reliability.

Project Information

Project Name

Sobha Estates Project

Category

Unifill

Location

United Arab Emirates

Norville Project

About project

At the Norville Project in Saudi Arabia, Unifill solutions supported construction efficiency through reliable and lightweight fill applications. The approach enabled effective structural performance suited to the project’s design and execution requirements.

Features of Project



Massive concrete reduction: Reduces concrete usage by up to 20–30%, lowering carbon emissions dramatically.

Lightweight slab design: Creates stronger yet lighter slabs, reducing overall building load.

Eco-friendly recycled material: Void formers are produced from high-quality recycled plastic, supporting circular construction.

Cost-efficient construction: Less concrete, less steel, and faster installation reduce overall project costs.

Improved structural performance: Enhances load distribution and allows for longer spans with fewer columns.

Certified sustainability solution: Fully compliant with international green building standards

Working Process

01
Step

Design & Planning

We study project requirements and create a tailored elevator solution that fits the building’s needs.
02
Step

Engineering & Fabrication

Our team prepares the technical designs and oversees the manufacturing of all components to ensure quality.
03
Step

Installation & Testing

Certified engineers install the system and perform full safety and performance testing.
04
Step

Handover & Maintenance

We hand over the completed system and provide ongoing after-sales and maintenance services for long-term reliability.

Project Information

Project Name

Norville Project

Category

Unifill

Location

Saudi Arabia

Sobha – The S Tower

About project

Unifill applications at Sobha S Tower supported high-rise construction with efficient void filling and reduced structural weight. The solution enabled optimized engineering performance suitable for a landmark tower project.

Features of Project



Massive concrete reduction: Reduces concrete usage by up to 20–30%, lowering carbon emissions dramatically.

Lightweight slab design: Creates stronger yet lighter slabs, reducing overall building load.

Eco-friendly recycled material: Void formers are produced from high-quality recycled plastic, supporting circular construction.

Cost-efficient construction: Less concrete, less steel, and faster installation reduce overall project costs.

Improved structural performance: Enhances load distribution and allows for longer spans with fewer columns.

Certified sustainability solution: Fully compliant with international green building standards

Working Process

01
Step

Design & Planning

We study project requirements and create a tailored elevator solution that fits the building’s needs.
02
Step

Engineering & Fabrication

Our team prepares the technical designs and oversees the manufacturing of all components to ensure quality.
03
Step

Installation & Testing

Certified engineers install the system and perform full safety and performance testing.
04
Step

Handover & Maintenance

We hand over the completed system and provide ongoing after-sales and maintenance services for long-term reliability.

Project Information

Project Name

Sobha – The S Tower

Category

Unifill

Location

United Arab Emirates

Sobha – Creek Vistas Grande

About project

At Sobha Creek Vistas Grande, Unifill solutions enhanced structural efficiency by enabling lightweight filling without compromising strength. This supported refined architectural detailing and consistent construction quality throughout the project.

Features of Project



Massive concrete reduction: Reduces concrete usage by up to 20–30%, lowering carbon emissions dramatically.

Lightweight slab design: Creates stronger yet lighter slabs, reducing overall building load.

Eco-friendly recycled material: Void formers are produced from high-quality recycled plastic, supporting circular construction.

Cost-efficient construction: Less concrete, less steel, and faster installation reduce overall project costs.

Improved structural performance: Enhances load distribution and allows for longer spans with fewer columns.

Certified sustainability solution: Fully compliant with international green building standards

Working Process

01
Step

Design & Planning

We study project requirements and create a tailored elevator solution that fits the building’s needs.
02
Step

Engineering & Fabrication

Our team prepares the technical designs and oversees the manufacturing of all components to ensure quality.
03
Step

Installation & Testing

Certified engineers install the system and perform full safety and performance testing.
04
Step

Handover & Maintenance

We hand over the completed system and provide ongoing after-sales and maintenance services for long-term reliability.

Project Information

Project Name

Sobha – Creek Vistas Grande

Category

Unifill

Location

United Arab Emirates

Verde by Sobha

About project

Unifill was utilized at Sobha Verde to complement sustainable building practices. The solution supported efficient structural design while aligning with the project’s emphasis on modern living and long-term performance.

Features of Project



Massive concrete reduction: Reduces concrete usage by up to 20–30%, lowering carbon emissions dramatically.

Lightweight slab design: Creates stronger yet lighter slabs, reducing overall building load.

Eco-friendly recycled material: Void formers are produced from high-quality recycled plastic, supporting circular construction.

Cost-efficient construction: Less concrete, less steel, and faster installation reduce overall project costs.

Improved structural performance: Enhances load distribution and allows for longer spans with fewer columns.

Certified sustainability solution: Fully compliant with international green building standards

Working Process

01
Step

Design & Planning

We study project requirements and create a tailored elevator solution that fits the building’s needs.
02
Step

Engineering & Fabrication

Our team prepares the technical designs and oversees the manufacturing of all components to ensure quality.
03
Step

Installation & Testing

Certified engineers install the system and perform full safety and performance testing.
04
Step

Handover & Maintenance

We hand over the completed system and provide ongoing after-sales and maintenance services for long-term reliability.

Project Information

Project Name

Verde by Sobha

Category

Unifill

Location

United Arab Emirates

Sobha – Creek Vistas Heights

About project

Unifill was applied at Sobha Creek Vista Heights to support high-rise residential construction with efficient void filling and reduced structural load. The solution contributed to optimized slab performance and smooth construction sequencing.

Features of Project



Massive concrete reduction: Reduces concrete usage by up to 20–30%, lowering carbon emissions dramatically.

Lightweight slab design: Creates stronger yet lighter slabs, reducing overall building load.

Eco-friendly recycled material: Void formers are produced from high-quality recycled plastic, supporting circular construction.

Cost-efficient construction: Less concrete, less steel, and faster installation reduce overall project costs.

Improved structural performance: Enhances load distribution and allows for longer spans with fewer columns.

Certified sustainability solution: Fully compliant with international green building standards

Working Process

01
Step

Design & Planning

We study project requirements and create a tailored elevator solution that fits the building’s needs.
02
Step

Engineering & Fabrication

Our team prepares the technical designs and oversees the manufacturing of all components to ensure quality.
03
Step

Installation & Testing

Certified engineers install the system and perform full safety and performance testing.
04
Step

Handover & Maintenance

We hand over the completed system and provide ongoing after-sales and maintenance services for long-term reliability.

Project Information

Project Name

Sobha | Creek Vistas Heights

Category

Unifill

Location

United Arab Emirates

Sobha The Crest

About project

At Sobha The Crest, Unifill systems were applied to support residential construction with a focus on efficiency and durability. The solution enhanced build quality while maintaining flexibility in structural design.

Features of Project



Massive concrete reduction: Reduces concrete usage by up to 20–30%, lowering carbon emissions dramatically.

Lightweight slab design: Creates stronger yet lighter slabs, reducing overall building load.

Eco-friendly recycled material: Void formers are produced from high-quality recycled plastic, supporting circular construction.

Cost-efficient construction: Less concrete, less steel, and faster installation reduce overall project costs.

Improved structural performance: Enhances load distribution and allows for longer spans with fewer columns.

Certified sustainability solution: Fully compliant with international green building standards

Working Process

01
Step

Design & Planning

We study project requirements and create a tailored elevator solution that fits the building’s needs.
02
Step

Engineering & Fabrication

Our team prepares the technical designs and oversees the manufacturing of all components to ensure quality.
03
Step

Installation & Testing

Certified engineers install the system and perform full safety and performance testing.
04
Step

Handover & Maintenance

We hand over the completed system and provide ongoing after-sales and maintenance services for long-term reliability.

Project Information

Project Name

Sobha | The Crest

Category

Unifill

Location

United Arab Emirates

Sobha Crest Grande

About project

Unifill systems were incorporated into Sobha Crest Grande to support advanced residential construction requirements. The solution helped balance structural performance with material efficiency, contributing to a refined and durable building outcome.

Features of Project



Massive concrete reduction: Reduces concrete usage by up to 20–30%, lowering carbon emissions dramatically.

Lightweight slab design: Creates stronger yet lighter slabs, reducing overall building load.

Eco-friendly recycled material: Void formers are produced from high-quality recycled plastic, supporting circular construction.

Cost-efficient construction: Less concrete, less steel, and faster installation reduce overall project costs.

Improved structural performance: Enhances load distribution and allows for longer spans with fewer columns.

Certified sustainability solution: Fully compliant with international green building standards

Working Process

01
Step

Design & Planning

We study project requirements and create a tailored elevator solution that fits the building’s needs.
02
Step

Engineering & Fabrication

Our team prepares the technical designs and oversees the manufacturing of all components to ensure quality.
03
Step

Installation & Testing

Certified engineers install the system and perform full safety and performance testing.
04
Step

Handover & Maintenance

We hand over the completed system and provide ongoing after-sales and maintenance services for long-term reliability.

Project Information

Project Name

Sobha | Crest Grande

Category

Unifill

Location

United Arab Emirates

Sobha Waves Opulence

About project

Designed for upscale waterfront living, Sobha Waves Opulence benefited from Unifill applications that supported efficient construction while maintaining high structural standards. The solution aligned with the project’s premium positioning and design complexity.

Features of Project



Massive concrete reduction: Reduces concrete usage by up to 20–30%, lowering carbon emissions dramatically.

Lightweight slab design: Creates stronger yet lighter slabs, reducing overall building load.

Eco-friendly recycled material: Void formers are produced from high-quality recycled plastic, supporting circular construction.

Cost-efficient construction: Less concrete, less steel, and faster installation reduce overall project costs.

Improved structural performance: Enhances load distribution and allows for longer spans with fewer columns.

Certified sustainability solution: Fully compliant with international green building standards

Working Process

01
Step

Design & Planning

We study project requirements and create a tailored elevator solution that fits the building’s needs.
02
Step

Engineering & Fabrication

Our team prepares the technical designs and oversees the manufacturing of all components to ensure quality.
03
Step

Installation & Testing

Certified engineers install the system and perform full safety and performance testing.
04
Step

Handover & Maintenance

We hand over the completed system and provide ongoing after-sales and maintenance services for long-term reliability.

Project Information

Project Name

Sobha Waves Opulence

Category

Unifill

Location

United Arab Emirates

The Node

About project

EEE Group delivered Unidome technology for The Node, Finland, an innovation-focused commercial development. The system supported modern architectural requirements with efficient slab performance, reduced material consumption, and sustainable construction outcomes.

Features of Project



Massive concrete reduction: Reduces concrete usage by up to 20–30%, lowering carbon emissions dramatically.

Lightweight slab design: Creates stronger yet lighter slabs, reducing overall building load.

Eco-friendly recycled material: Void formers are produced from high-quality recycled plastic, supporting circular construction.

Cost-efficient construction: Less concrete, less steel, and faster installation reduce overall project costs.

Improved structural performance: Enhances load distribution and allows for longer spans with fewer columns.

Certified sustainability solution: Fully compliant with international green building standards

Working Process

01
Step

Design & Planning

We study project requirements and create a tailored elevator solution that fits the building’s needs.
02
Step

Engineering & Fabrication

Our team prepares the technical designs and oversees the manufacturing of all components to ensure quality.
03
Step

Installation & Testing

Certified engineers install the system and perform full safety and performance testing.
04
Step

Handover & Maintenance

We hand over the completed system and provide ongoing after-sales and maintenance services for long-term reliability.

Project Information

Project Name

The Node

Project Type

Innovation / Commercial Project

Category

Unidome

Location

Finland

4 Buildings (G+7) Commercial & Residential

About project

EEE Group supplied Unidome systems for four G+7 mixed-use commercial and residential buildings in Sharjah. The solution supported efficient floor spans, reduced concrete consumption, and enhanced overall structural performance while maintaining cost-effective and sustainable construction.

Features of Project



Massive concrete reduction: Reduces concrete usage by up to 20–30%, lowering carbon emissions dramatically.

Lightweight slab design: Creates stronger yet lighter slabs, reducing overall building load.

Eco-friendly recycled material: Void formers are produced from high-quality recycled plastic, supporting circular construction.

Cost-efficient construction: Less concrete, less steel, and faster installation reduce overall project costs.

Improved structural performance: Enhances load distribution and allows for longer spans with fewer columns.

Certified sustainability solution: Fully compliant with international green building standards

Working Process

01
Step

Design & Planning

We study project requirements and create a tailored elevator solution that fits the building’s needs.
02
Step

Engineering & Fabrication

Our team prepares the technical designs and oversees the manufacturing of all components to ensure quality.
03
Step

Installation & Testing

Certified engineers install the system and perform full safety and performance testing.
04
Step

Handover & Maintenance

We hand over the completed system and provide ongoing after-sales and maintenance services for long-term reliability.

Project Information

Project Name

4 Buildings (G+7) Commercial & Residential

Project Type

Mixed-Use Commercial & Residential Project

Category

Unidome

Location

Sharjah, UAE

Green Building

About project

EEE Group supplied Unidome systems for a Green Building project in Germany, focused on sustainability and environmental efficiency. The solution contributed to reduced concrete volume, lower embodied carbon, and optimized structural performance aligned with green building principles.

Features of Project



Massive concrete reduction: Reduces concrete usage by up to 20–30%, lowering carbon emissions dramatically.

Lightweight slab design: Creates stronger yet lighter slabs, reducing overall building load.

Eco-friendly recycled material: Void formers are produced from high-quality recycled plastic, supporting circular construction.

Cost-efficient construction: Less concrete, less steel, and faster installation reduce overall project costs.

Improved structural performance: Enhances load distribution and allows for longer spans with fewer columns.

Certified sustainability solution: Fully compliant with international green building standards

Working Process

01
Step

Design & Planning

We study project requirements and create a tailored elevator solution that fits the building’s needs.
02
Step

Engineering & Fabrication

Our team prepares the technical designs and oversees the manufacturing of all components to ensure quality.
03
Step

Installation & Testing

Certified engineers install the system and perform full safety and performance testing.
04
Step

Handover & Maintenance

We hand over the completed system and provide ongoing after-sales and maintenance services for long-term reliability.

Project Information

Project Name

Green Building

Project Type

Sustainable / Environmental Project

Category

Unidome

Location

Germany

Gebaude D4 am Bachgraben

About project

EEE Group supplied Unidome void former systems for Gebaude D4 am Bachgraben, Switzerland, a commercial office project. The solution enabled efficient floor spans, reduced structural weight, and supported sustainable and cost-effective construction.

Features of Project



Massive concrete reduction: Reduces concrete usage by up to 20–30%, lowering carbon emissions dramatically.

Lightweight slab design: Creates stronger yet lighter slabs, reducing overall building load.

Eco-friendly recycled material: Void formers are produced from high-quality recycled plastic, supporting circular construction.

Cost-efficient construction: Less concrete, less steel, and faster installation reduce overall project costs.

Improved structural performance: Enhances load distribution and allows for longer spans with fewer columns.

Certified sustainability solution: Fully compliant with international green building standards

Working Process

01
Step

Design & Planning

We study project requirements and create a tailored elevator solution that fits the building’s needs.
02
Step

Engineering & Fabrication

Our team prepares the technical designs and oversees the manufacturing of all components to ensure quality.
03
Step

Installation & Testing

Certified engineers install the system and perform full safety and performance testing.
04
Step

Handover & Maintenance

We hand over the completed system and provide ongoing after-sales and maintenance services for long-term reliability.

Project Information

Project Name

Gebaude D4 am Bachgraben

Project Type

Commercial / Office Project

Category

Unidome

Location

Switzerland

Struzon Project

About project

EEE Group delivered Unidome solutions across multiple Struzon Projects in India, supporting commercial and infrastructure developments. The system enabled optimized slab performance, reduced construction materials, and improved overall structural efficiency across diverse project requirements.

Features of Project



Massive concrete reduction: Reduces concrete usage by up to 20–30%, lowering carbon emissions dramatically.

Lightweight slab design: Creates stronger yet lighter slabs, reducing overall building load.

Eco-friendly recycled material: Void formers are produced from high-quality recycled plastic, supporting circular construction.

Cost-efficient construction: Less concrete, less steel, and faster installation reduce overall project costs.

Improved structural performance: Enhances load distribution and allows for longer spans with fewer columns.

Certified sustainability solution: Fully compliant with international green building standards

Working Process

01
Step

Design & Planning

We study project requirements and create a tailored elevator solution that fits the building’s needs.
02
Step

Engineering & Fabrication

Our team prepares the technical designs and oversees the manufacturing of all components to ensure quality.
03
Step

Installation & Testing

Certified engineers install the system and perform full safety and performance testing.
04
Step

Handover & Maintenance

We hand over the completed system and provide ongoing after-sales and maintenance services for long-term reliability.

Project Information

Project Name

Ikon Tower

Project Type

Commercial / Infrastructure Projects

Category

Unidome

Location

India

Ikon Tower

About project

EEE Group implemented Unidome void former technology at Ikon Tower, Spain, a high-rise residential and commercial development. The solution enhanced structural efficiency, reduced slab weight, and supported optimized floor designs for high-rise construction.

Features of Project



Massive concrete reduction: Reduces concrete usage by up to 20–30%, lowering carbon emissions dramatically.

Lightweight slab design: Creates stronger yet lighter slabs, reducing overall building load.

Eco-friendly recycled material: Void formers are produced from high-quality recycled plastic, supporting circular construction.

Cost-efficient construction: Less concrete, less steel, and faster installation reduce overall project costs.

Improved structural performance: Enhances load distribution and allows for longer spans with fewer columns.

Certified sustainability solution: Fully compliant with international green building standards

Working Process

01
Step

Design & Planning

We study project requirements and create a tailored elevator solution that fits the building’s needs.
02
Step

Engineering & Fabrication

Our team prepares the technical designs and oversees the manufacturing of all components to ensure quality.
03
Step

Installation & Testing

Certified engineers install the system and perform full safety and performance testing.
04
Step

Handover & Maintenance

We hand over the completed system and provide ongoing after-sales and maintenance services for long-term reliability.

Project Information

Project Name

Ikon Tower

Project Type

High-Rise Residential / Commercial Project

Category

Unidome

Location

Spain

Othaim Hotel

About project

Unidome solutions were delivered for Othaim Hotel Al Rabwa, Riyadh, a hospitality development requiring efficient and durable structural systems. The solution reduced slab weight, optimized material usage, and supported long-term operational performance.

Features of Project



Massive concrete reduction: Reduces concrete usage by up to 20–30%, lowering carbon emissions dramatically.

Lightweight slab design: Creates stronger yet lighter slabs, reducing overall building load.

Eco-friendly recycled material: Void formers are produced from high-quality recycled plastic, supporting circular construction.

Cost-efficient construction: Less concrete, less steel, and faster installation reduce overall project costs.

Improved structural performance: Enhances load distribution and allows for longer spans with fewer columns.

Certified sustainability solution: Fully compliant with international green building standards

Working Process

01
Step

Design & Planning

We study project requirements and create a tailored elevator solution that fits the building’s needs.
02
Step

Engineering & Fabrication

Our team prepares the technical designs and oversees the manufacturing of all components to ensure quality.
03
Step

Installation & Testing

Certified engineers install the system and perform full safety and performance testing.
04
Step

Handover & Maintenance

We hand over the completed system and provide ongoing after-sales and maintenance services for long-term reliability.

Project Information

Project Name

Othaim Hotel

Project Type

Hospitality Project

Category

Unidome

Location

Saudi Arabia

Elsa Bienenfeld Schule

About project

EEE Group delivered Unidome solutions for the Elsa Bienenfeld School in Austria, an educational project requiring efficient structural systems and long-term durability. The system supported optimized slab design, reduced material usage, and flexible internal layouts suitable for educational spaces.

Features of Project



Massive concrete reduction: Reduces concrete usage by up to 20–30%, lowering carbon emissions dramatically.

Lightweight slab design: Creates stronger yet lighter slabs, reducing overall building load.

Eco-friendly recycled material: Void formers are produced from high-quality recycled plastic, supporting circular construction.

Cost-efficient construction: Less concrete, less steel, and faster installation reduce overall project costs.

Improved structural performance: Enhances load distribution and allows for longer spans with fewer columns.

Certified sustainability solution: Fully compliant with international green building standards

Working Process

01
Step

Design & Planning

We study project requirements and create a tailored elevator solution that fits the building’s needs.
02
Step

Engineering & Fabrication

Our team prepares the technical designs and oversees the manufacturing of all components to ensure quality.
03
Step

Installation & Testing

Certified engineers install the system and perform full safety and performance testing.
04
Step

Handover & Maintenance

We hand over the completed system and provide ongoing after-sales and maintenance services for long-term reliability.

Project Information

Project Name

Elsa Bienefeld Schule

Project Type

Educational Project

Category

Unidome

Location

Austria

Uniq Towers

About project

EEE Group delivered Unidome void former solutions for Uniq Towers, Germany, a modern residential and mixed-use project. The system supported efficient slab construction, reduced material consumption, and enhanced overall structural performance in line with European sustainability standards.

Features of Project



Massive concrete reduction: Reduces concrete usage by up to 20–30%, lowering carbon emissions dramatically.

Lightweight slab design: Creates stronger yet lighter slabs, reducing overall building load.

Eco-friendly recycled material: Void formers are produced from high-quality recycled plastic, supporting circular construction.

Cost-efficient construction: Less concrete, less steel, and faster installation reduce overall project costs.

Improved structural performance: Enhances load distribution and allows for longer spans with fewer columns.

Certified sustainability solution: Fully compliant with international green building standards

Working Process

01
Step

Design & Planning

We study project requirements and create a tailored elevator solution that fits the building’s needs.
02
Step

Engineering & Fabrication

Our team prepares the technical designs and oversees the manufacturing of all components to ensure quality.
03
Step

Installation & Testing

Certified engineers install the system and perform full safety and performance testing.
04
Step

Handover & Maintenance

We hand over the completed system and provide ongoing after-sales and maintenance services for long-term reliability.

Project Information

Project Name

Uniq Towers

Project Type

Residential / Mixed-Use Project

Category

Unidome

Location

Germany

VYE SODIC

About project

EEE Group successfully implemented Unidome void former solutions for VYE Sodic, Egypt, a large-scale residential and mixed-use development. The system enhanced structural efficiency, optimized slab design, and supported cost-effective and sustainable construction across the project.

Features of Project



Massive concrete reduction: Reduces concrete usage by up to 20–30%, lowering carbon emissions dramatically.

Lightweight slab design: Creates stronger yet lighter slabs, reducing overall building load.

Eco-friendly recycled material: Void formers are produced from high-quality recycled plastic, supporting circular construction.

Cost-efficient construction: Less concrete, less steel, and faster installation reduce overall project costs.

Improved structural performance: Enhances load distribution and allows for longer spans with fewer columns.

Certified sustainability solution: Fully compliant with international green building standards

Working Process

01
Step

Design & Planning

We study project requirements and create a tailored elevator solution that fits the building’s needs.
02
Step

Engineering & Fabrication

Our team prepares the technical designs and oversees the manufacturing of all components to ensure quality.
03
Step

Installation & Testing

Certified engineers install the system and perform full safety and performance testing.
04
Step

Handover & Maintenance

We hand over the completed system and provide ongoing after-sales and maintenance services for long-term reliability.

Project Information

Project Name

VYE SODIC

Project Type

Residential / Mixed-Use Project

Category

Unidome

Location

Egypt

Al Raya Mall

About project

EEE Group successfully implemented Unidome technology at Raya Mall in Jordan, a commercial retail development. The system enabled longer spans, reduced concrete usage, and supported flexible retail layouts while contributing to sustainable construction practices.

Features of Project



Massive concrete reduction: Reduces concrete usage by up to 20–30%, lowering carbon emissions dramatically.

Lightweight slab design: Creates stronger yet lighter slabs, reducing overall building load.

Eco-friendly recycled material: Void formers are produced from high-quality recycled plastic, supporting circular construction.

Cost-efficient construction: Less concrete, less steel, and faster installation reduce overall project costs.

Improved structural performance: Enhances load distribution and allows for longer spans with fewer columns.

Certified sustainability solution: Fully compliant with international green building standards

Working Process

01
Step

Design & Planning

We study project requirements and create a tailored elevator solution that fits the building’s needs.
02
Step

Engineering & Fabrication

Our team prepares the technical designs and oversees the manufacturing of all components to ensure quality.
03
Step

Installation & Testing

Certified engineers install the system and perform full safety and performance testing.
04
Step

Handover & Maintenance

We hand over the completed system and provide ongoing after-sales and maintenance services for long-term reliability.

Project Information

Project Name

Al Raya Mall

Project Type

Commercial / Retail Project

Category

Unidome

Location

Jordan

Najmat RDK Towers

About Project

EEE Group delivered Shanghai Mitsubishi elevator systems for the RDK Towers, a high-rise residential project. The elevators are designed to handle residential traffic efficiently, offering smooth operation, enhanced safety features, and long-term reliability for everyday use.

Features of Project



High-capacity system: 21 elevators designed to support smooth and efficient resident traffic throughout the building.

Smooth & quiet operation: Enhanced ride quality ensuring a calm and pleasant daily commute for residents.

Advanced safety technology: Equipped with the latest international safety standards.

Energy-efficient performance: Optimized systems to reduce power consumption.

Reliable for high usage: Reliable, long-life components designed for round-the-clock operation.

Elegant cabin finishes: Modern interiors complementing the luxury design of RDK Towers.

Working Process

01
Step

Design & Planning

We study project requirements and create a tailored elevator solution that fits the building’s needs.
02
Step

Engineering & Fabrication

Our team prepares the technical designs & oversees the manufacturing of all components to ensure quality.
03
Step

Installation & Testing

Certified engineers install the system and perform full safety and performance testing.
04
Step

Handover & Maintenance

We hand over the completed system and provide ongoing after-sales and maintenance services for long-term reliability.

Project Information

Client Name

RDK COMMERCIAL INVESTMENT

Category

Shanghai Mitsubishi Elevator

Consultant

FOSTER + PARTNERS

Contractors

JIANGSU NANONGLIU
JIAN CONSTRUCTION GROUP CO.

Location

AbuDhabi

Units / stops

21 units, 28 stops

Telal Hotel

About project

EEE Group successfully delivered Shanghai Mitsubishi elevator systems for Telal Hotel & Hotel Apartment, a hospitality project combining hotel and serviced apartment operations. The installation supports seamless guest movement, efficient service flow, and reliable performance, ensuring a comfortable and premium hospitality experience.

Features of Project



High-capacity system: 17 elevators engineered to handle continuous hotel traffic.

Smooth & quiet operation: Premium ride comfort suitable for luxury hospitality.

Advanced safety technology: Equipped with the latest international safety standards.

Energy-efficient performance: Optimized systems to reduce power consumption.

Reliable for high usage: Durable components designed for 24/7 hotel operation.

Elegant cabin finishes: Modern interiors complementing the luxury design of Telal Hotel

Working Process

01
Step

Design & Planning

We study project requirements and create a tailored elevator solution that fits the building’s needs.
02
Step

Engineering & Fabrication

Our team prepares the technical designs and oversees the manufacturing of all components to ensure quality.
03
Step

Installation & Testing

Certified engineers install the system and perform full safety and performance testing.
04
Step

Handover & Maintenance

We hand over the completed system and provide ongoing after-sales and maintenance services for long-term reliability.

Project Information

Client Name

HH. Shaikh Mohammed Bin Ali Bin Rashid Al Nuaimi

Category

Shanghai Mitsubishi Elevator

Consultant

Al Waha Engineering Consultancy

Contractors

Modern Building Contracting

Location

Barsha Heights, Dubai, UAE

Units / stops

17 units, 25 stops

Asiana Grand Hotel

About project

EEE Group installed high-performance Shanghai Mitsubishi elevators at Asiana Grand Hotel, a full-service hospitality project. The elevators provide smooth and efficient vertical transportation, supporting guest comfort, operational efficiency, and consistent performance across all floors.

Features of Project



High-rise performance: Elevators engineered to operate smoothly across 13 stops with consistent ride comfort.

Premium speed & efficiency: High-speed travel reducing waiting times for guests and residents.

Advanced safety systems: Equipped with state-of-the-art safety features meeting international standards.

Energy-efficient technology: Optimized motors and controls to minimize power consumption.

Durable & reliable design: Built for heavy daily usage in hospitality environments with minimal downtime.

Elegant cabin finishes: Modern interiors that complement the luxury aesthetics of Asiana Grand Hotel.

Working Process

01
Step

Design & Planning

We study project requirements and create a tailored elevator solution that fits the building’s needs.
02
Step

Engineering & Fabrication

Our team prepares the technical designs and oversees the manufacturing of all components to ensure quality.
03
Step

Installation & Testing

Certified engineers install the system and perform full safety and performance testing.
04
Step

Handover & Maintenance

We hand over the completed system and provide ongoing after-sales and maintenance services for long-term reliability.

Project Information

Client Name

Asiana Hotel

Category

Shanghai Mitsubishi Elevator

Consultant

Architect Consultant Engineering

Contractors

Al Hamad International

Location

Deira, Dubai, UAE

Units / stops

6 units, 13 stops

Atlantis the royal

About project

For one of the most iconic hospitality landmarks in the region, Unifill solutions were utilized to meet complex construction demands. The system supported large-scale structural requirements while aligning with the project’s premium design, precision engineering, and world-class standards.

Features of Project



Massive concrete reduction: Reduces concrete usage by up to 20–30%, lowering carbon emissions dramatically.

Lightweight slab design: Creates stronger yet lighter slabs, reducing overall building load.

Eco-friendly recycled material: Void formers are produced from high-quality recycled plastic, supporting circular construction.

Cost-efficient construction: Less concrete, less steel, and faster installation reduce overall project costs.

Improved structural performance: Enhances load distribution and allows for longer spans with fewer columns.

Certified sustainability solution: Fully compliant with international green building standards

Working Process

01
Step

Design & Planning

We study project requirements and create a tailored elevator solution that fits the building’s needs.
02
Step

Engineering & Fabrication

Our team prepares the technical designs and oversees the manufacturing of all components to ensure quality.
03
Step

Installation & Testing

Certified engineers install the system and perform full safety and performance testing.
04
Step

Handover & Maintenance

We hand over the completed system and provide ongoing after-sales and maintenance services for long-term reliability.

Project Information

Project Name

Atlantis the Royal

Category

Unifill

Location

United Arab Emirates

Arada Tiraz

About project

At Arada Tiraz, Unifill played a key role in enabling smart construction practices through lightweight and efficient fill solutions. The application supported optimized structural performance while maintaining speed and precision across the development stages.

Features of Project



Massive concrete reduction: Reduces concrete usage by up to 20–30%, lowering carbon emissions dramatically.

Lightweight slab design: Creates stronger yet lighter slabs, reducing overall building load.

Eco-friendly recycled material: Void formers are produced from high-quality recycled plastic, supporting circular construction.

Cost-efficient construction: Less concrete, less steel, and faster installation reduce overall project costs.

Improved structural performance: Enhances load distribution and allows for longer spans with fewer columns.

Certified sustainability solution: Fully compliant with international green building standards

Working Process

01
Step

Design & Planning

We study project requirements and create a tailored elevator solution that fits the building’s needs.
02
Step

Engineering & Fabrication

Our team prepares the technical designs and oversees the manufacturing of all components to ensure quality.
03
Step

Installation & Testing

Certified engineers install the system and perform full safety and performance testing.
04
Step

Handover & Maintenance

We hand over the completed system and provide ongoing after-sales and maintenance services for long-term reliability.

Project Information

Project Name

Arada Tiraz

Category

Unifill

Location

United Arab Emirates

Alexis Tower – Reportage

About project

Unifill solutions were implemented at Alexis Tower to support efficient structural backfilling and load distribution. The system contributed to streamlined construction progress while ensuring long-term stability aligned with the project’s residential design and performance requirements.

Features of Project



Massive concrete reduction: Reduces concrete usage by up to 20–30%, lowering carbon emissions dramatically.

Lightweight slab design: Creates stronger yet lighter slabs, reducing overall building load.

Eco-friendly recycled material: Void formers are produced from high-quality recycled plastic, supporting circular construction.

Cost-efficient construction: Less concrete, less steel, and faster installation reduce overall project costs.

Improved structural performance: Enhances load distribution and allows for longer spans with fewer columns.

Certified sustainability solution: Fully compliant with international green building standards

Working Process

01
Step

Design & Planning

We study project requirements and create a tailored elevator solution that fits the building’s needs.
02
Step

Engineering & Fabrication

Our team prepares the technical designs and oversees the manufacturing of all components to ensure quality.
03
Step

Installation & Testing

Certified engineers install the system and perform full safety and performance testing.
04
Step

Handover & Maintenance

We hand over the completed system and provide ongoing after-sales and maintenance services for long-term reliability.

Project Information

Project Name

Alexis Tower – Reportage

Category

Unifill

Location

United Arab Emirates

Emirates Lounge

About project

The project aimed to enhance the indoor air quality for a VIP terminal by installing air filtration units and fire proof ashtrays units to a more advanced, suitable for 24/7 airport operations.

Features of Project



High-capacity filtration System

Low-noise units,

Multi-stage HEPA + activated carbon filtration

Working Process

01
Step

Site Visit

The site visit includes a detailed location evaluation to assess room ventilation, identify fresh-air supply points, and determine the optimal placement for the filtration or smoking cabin system.
02
Step

Order and production

Order and production involve confirming all technical specifications, initiating customised fabrication of the unit, and coordinating component assembly to ensure the final system meets performance and quality standards
03
Step

Delivery, Testing & Installation

Delivery, installation, and testing include transporting the completed unit to site, executing a precise and safe installation, integrating electrical and ventilation connections, and conducting full operational tests to verify airflow performance, filtration efficiency, and safety compliance.
04
Step

Service Maintenance

Service maintenance includes scheduled inspections, filter replacements if due

Project Information

Client Name

Emirates

Category

QleanAir

Location

UAE

Units / stops

8 units AQ High VII,
6 Units AQ Low 115,
10 Cleanup Ashtray Medium

Dubai International Airport (DXB)

About project

To cater to high foot-traffic staff areas, we designed and installed indoor smoking cabins that maximise efficiency while occupying minimal floor space.

Features of Project



Space-saving cabin design

Automated sensors

High-capacity filtration System

Multi-stage HEPA + activated carbon filtration

Working Process

01
Step

Site Visit

The site visit includes a detailed location evaluation to assess room ventilation, identify fresh-air supply points, and determine the optimal placement for the filtration or smoking cabin system.
02
Step

Order and production

Order & production involve confirming all technical specifications, initiating customised fabrication of the unit & coordinating component assembly to ensure the final system meets performance & quality standards
03
Step

Delivery, Testing & Installation

Delivery, installation, and testing include transporting the completed unit to site, executing a precise and safe installation, integrating electrical and ventilation connections, and conducting full operational tests to verify airflow performance, filtration efficiency, and safety compliance.
04
Step

Service Maintenance

Service maintenance includes scheduled inspections, filter replacements if due

Project Information

Client Name

Dubai International Airport (DXB)

Category

QleanAir

Location

UAE

Units / stops

15 units of Smoking Cabins,
20 units of AirQlean High,
18 units of QleanUp Ashtrays

MC Gettigans

About project

The project focused on significantly improving indoor air quality across the bar areas by installing high-efficiency air-filtration units, engineered to handle continuous usage while ensuring cleaner air, reduced odour.

Features of Project



High-capacity filtration System

Low-noise units,

Multi-stage HEPA + activated carbon filtration

Working Process

01
Step

Site Visit

The site visit includes a detailed location evaluation to assess room ventilation, identify fresh-air supply points, and determine the optimal placement for the filtration or smoking cabin system.
02
Step

Order and production

Order & production involve confirming all technical specifications, initiating customised fabrication of the unit, and coordinating component assembly to ensure the final system meets performance and quality standards.
03
Step

Delivery, Testing & Installation

Delivery, installation, and testing include transporting the completed unit to site, executing a precise and safe installation, integrating electrical and ventilation connections, and conducting full operational tests to verify airflow performance, filtration efficiency, and safety compliance.
04
Step

Service Maintenance

Service maintenance includes scheduled inspections, filter replacements if due.

Project Information

Client Name

Dusit Thani

Category

QleanAir

Location

Abu Dhabi, UAE

Units / stops

2 units AQ Low 115
10 units AQ High Ceiling

Marhaba Lounge

About project

The project aimed to enhance the indoor air quality for a VIP terminal by installing air filtration units and fire proof ashtrays units to a more advanced, suitable for 24/7 airport operations.

Features of Project



Space-saving cabin design

Automated sensors

High-capacity filtration System

Multi-stage HEPA + activated carbon filtration

Working Process

01
Step

Site Visit

The site visit includes a detailed location evaluation to assess room ventilation, identify fresh-air supply points, and determine the optimal placement for the filtration or smoking cabin system.
02
Step

Order and production

Order and production involve confirming all technical specifications, initiating customised fabrication of the unit, and coordinating component assembly to ensure the final system meets performance and quality standards
03
Step

Delivery, Testing & Installation

Delivery, installation, and testing include transporting the completed unit to site, executing a precise and safe installation, integrating electrical and ventilation connections, and conducting full operational tests to verify airflow performance, filtration efficiency, and safety compliance.
04
Step

Service Maintenance

Service maintenance includes scheduled inspections, filter replacements if due

Project Information

Client Name

DNATA

Category

QleanAir

Location

UAE

Units / stops

4 units Smoking Cabins

Saadiyat

About project

EEE Group delivered Unidome void former solutions for Saadiyat Grove, a landmark mixed-use commercial and residential development in the UAE. The system enabled optimized slab design, reduced structural loads, and improved material efficiency, supporting high-performance construction and long-term sustainability.

Features of Project



Massive concrete reduction: Reduces concrete usage by up to 20–30%, lowering carbon emissions dramatically.

Lightweight slab design: Creates stronger yet lighter slabs, reducing overall building load.

Eco-friendly recycled material: Void formers are produced from high-quality recycled plastic, supporting circular construction.

Cost-efficient construction: Less concrete, less steel, and faster installation reduce overall project costs.

Improved structural performance: Enhances load distribution and allows for longer spans with fewer columns.

Certified sustainability solution: Fully compliant with international green building standards

Working Process

01
Step

Design & Planning

We study project requirements and create a tailored elevator solution that fits the building’s needs.
02
Step

Engineering & Fabrication

Our team prepares the technical designs and oversees the manufacturing of all components to ensure quality.
03
Step

Installation & Testing

Certified engineers install the system and perform full safety and performance testing.
04
Step

Handover & Maintenance

We hand over the completed system and provide ongoing after-sales and maintenance services for long-term reliability.

Project Information

Project Name

Saadiyat

Project Type

Mixed-Use Commercial & Residential Project

Category

Unidome

Location

Abu Dhabi, UAE

Pixels

About project

Unidome technology was implemented to achieve a lighter, more efficient slab structure across the project. By integrating our recycled plastic void formers, the development benefited from reduced concrete usage, improved structural performance, and enhanced sustainability—supporting Kuwait’s vision for greener, more efficient buildings.

Features of Project



Massive concrete reduction: Reduces concrete usage by up to 20–30%, lowering carbon emissions dramatically.

Lightweight slab design: Creates stronger yet lighter slabs, reducing overall building load.

Eco-friendly recycled material: Void formers are produced from high-quality recycled plastic, supporting circular construction.

Cost-efficient construction: Less concrete, less steel, and faster installation reduce overall project costs.

Improved structural performance: Enhances load distribution and allows for longer spans with fewer columns.

Certified sustainability solution: Fully compliant with international green building standards

Working Process

01
Step

Design & Planning

We study project requirements and create a tailored elevator solution that fits the building’s needs.
02
Step

Engineering & Fabrication

Our team prepares the technical designs and oversees the manufacturing of all components to ensure quality.
03
Step

Installation & Testing

Certified engineers install the system and perform full safety and performance testing.
04
Step

Handover & Maintenance

We hand over the completed system and provide ongoing after-sales and maintenance services for long-term reliability.

Project Information

Project Name

Pixels

Project Type

Commercial

Category

Unidome

Location

Kuwait

Othaim Park

About project

Unidome void former technology was implemented at Othaim Park, Dammam, a large-scale commercial and retail development. The solution optimized slab weight, enabled wide column-free spaces, and improved structural efficiency suited for high-traffic retail environments.

Features of Project



Massive concrete reduction: Reduces concrete usage by up to 20–30%, lowering carbon emissions dramatically.

Lightweight slab design: Creates stronger yet lighter slabs, reducing overall building load.

Eco-friendly recycled material: Void formers are produced from high-quality recycled plastic, supporting circular construction.

Cost-efficient construction: Less concrete, less steel, and faster installation reduce overall project costs.

Improved structural performance: Enhances load distribution and allows for longer spans with fewer columns.

Certified sustainability solution: Fully compliant with international green building standards

Working Process

01
Step

Design & Planning

We study project requirements and create a tailored elevator solution that fits the building’s needs.
02
Step

Engineering & Fabrication

Our team prepares the technical designs and oversees the manufacturing of all components to ensure quality.
03
Step

Installation & Testing

Certified engineers install the system and perform full safety and performance testing.
04
Step

Handover & Maintenance

We hand over the completed system and provide ongoing after-sales and maintenance services for long-term reliability.

Project Information

Project Name

Othaim Park

Project Type

Hospitality Project

Category

Unidome

Location

Dammam, Saudi Arabia

OPUS Omniyat

About project

Titan supplied a fully panoramic, curved bespoke elevator for OPUS by Omniyat, one of Dubai’s most iconic architectural landmarks. Designed to complement the building’s fluid geometry, the elevator offers uninterrupted views and a visually striking journey, combining precision engineering with architectural artistry to enhance the overall user experience.

Features of Project



Fully panoramic curved design: Custom-engineered curved glazing delivers uninterrupted views and a visually immersive vertical journey.

Architectural integration: Elevator geometry precisely aligned with the building’s fluid form, enhancing the landmark’s sculptural identity.

Ultra-smooth ride quality: Precision drive and control systems ensure seamless, vibration-free movement throughout travel.

High-clarity glass systems: Specialized glazing minimizes visual distortion while maintaining safety and structural integrity.

Silent operation: Advanced engineering reduces noise, preserving the calm and refined atmosphere of the space.

Bespoke interior detailing: Custom finishes and lighting designed to complement the architectural character of OPUS.

Working Process

01
Step

Design & Planning

We study project requirements and create a tailored elevator solution that fits the building’s needs.
02
Step

Engineering & Fabrication

Our team prepares the technical designs and oversees the manufacturing of all components to ensure quality.
03
Step

Installation & Testing

Certified engineers install the system and perform full safety and performance testing.
04
Step

Handover & Maintenance

We hand over the completed system and provide ongoing after-sales and maintenance services for long-term reliability.

Project Information

Client Name

OMNIYAT

Project Typre

Bespoke Panoramic Architectural Lift

Category

Titan New Lifts

Consultant

ASTBURY SHEPHERD

Contractors

BOND INTERIORS

Location

Business Bay,Dubai,UAE

Units / stops

2 units, 2 stops

Mobility Pavilion – The Alif

About project

WORLD GUINNESS RECORD HOLDER — Titan delivered the largest passenger lift in the world at the Alif Mobility Pavilion, Expo 2020 Dubai. This fully bespoke elevator is engineered to accommodate up to 200 passengers in a single journey, setting a global benchmark in lift design, capacity, and engineering excellence. The project represents a milestone achievement, combining advanced technology, exceptional safety standards, and iconic architectural integration.

Features of Project



World Guinness Record–holding capacity: Recognized as the largest passenger elevator in the world, capable of transporting up to 200 passengers in a single journey.

Fully bespoke engineering: Designed and built from the ground up to meet unprecedented capacity, dimensional, and performance requirements.

Exceptional ride stability: Advanced control and guidance systems ensure smooth, balanced travel despite the lift’s extraordinary size and load.

High-level safety architecture: Multiple redundant safety systems engineered to exceed international standards for large-capacity passenger movement.

Optimized passenger flow: Designed to handle peak visitor traffic efficiently, minimizing congestion and enhancing user experience.

Iconic architectural integration: Seamlessly integrated into the Mobility Pavilion’s design, making the elevator a central feature of the visitor experience.

Working Process

01
Step

Design & Planning

We study project requirements and create a tailored elevator solution that fits the building’s needs.
02
Step

Engineering & Fabrication

Our team prepares the technical designs and oversees the manufacturing of all components to ensure quality.
03
Step

Installation & Testing

Certified engineers install the system and perform full safety and performance testing.
04
Step

Handover & Maintenance

We hand over the completed system and provide ongoing after-sales and maintenance services for long-term reliability.

Project Information

Client Name

EMAAR

Category

Titan New Lifts

Consultant

WSP

Contractors

ALEC

Location

Expo city

Units / stops

1 unit, 2 stops

Sterling Tower (East)

About project

Titan delivered lift solutions for the Sterling Townhouses, designed to support modern residential living with smooth, quiet, and reliable vertical mobility. The installation complements the townhouse lifestyle by providing efficient access across levels while maintaining comfort, safety, and long-term performance for residents.

Features of Project



Residential-focused performance: Lift systems designed to suit townhouse living, providing reliable vertical access across private residential levels.

Smooth and quiet operation: Engineered to minimize noise and vibration, ensuring a calm and comfortable home environment.

Space-efficient design: Compact lift solutions integrated seamlessly within townhouse layouts without compromising living space.

Enhanced safety features: Equipped with modern safety and emergency systems to ensure peace of mind for residents.

Energy-efficient operation: Optimized drive systems support low energy consumption suitable for residential use.

Refined interior finishes: Clean, modern cabin aesthetics designed to complement contemporary townhouse interiors.

Working Process

01
Step

Design & Planning

We study project requirements and create a tailored elevator solution that fits the building’s needs.
02
Step

Engineering & Fabrication

Our team prepares the technical designs and oversees the manufacturing of all components to ensure quality.
03
Step

Installation & Testing

Certified engineers install the system and perform full safety and performance testing.
04
Step

Handover & Maintenance

We hand over the completed system and provide ongoing after-sales and maintenance services for long-term reliability.

Project Information

Client Name

OMNIYAT

Project Type

Residential Lift Project

Category

Titan New Lifts

Consultant

Naga Architects

Contractors

Shapoorji Pallonji

Location

Dubai

Units / stops

2 units, 5 stops