EEE Group

Arab Bank

Arab Bank

Moving Architecture

About project

Al Hussaini Towers is a prominent high-rise development in Amman, requiring a robust and high-capacity vertical transportation solution to support intensive daily use across multiple floors. The project called for proven technology capable of delivering consistent performance, smooth circulation, and long-term operational reliability.

Our scope included the delivery of 12 elevators from Shanghai Mitsubishi, serving 22 stops, ensuring efficient vertical movement and dependable service in a demanding high-rise environment.

Features of Project

Corporate-grade performance: Two elevator units engineered to support consistent daily use within a banking headquarters.
Efficient vertical access: Serving 12 stops with smooth operation to ensure efficient movement between office levels.
Quiet and comfortable travel: Reduced noise and vibration to maintain a calm, professional atmosphere.
Advanced safety systems: Equipped with modern safety and emergency features aligned with international standards.
Reliable long-term operation: Durable components designed for continuous use and dependable performance.
Professional cabin design: Clean, refined interiors suited to a corporate and financial institution environment.

Working Process

01
Step

Design & Planning

We study project requirements and create a tailored elevator solution that fits the building’s needs.
02
Step

Engineering & Fabrication

Our team prepares the technical designs & oversees the manufacturing of all components to ensure quality.
03
Step

Installation & Testing

Certified engineers install the system and perform full safety and performance testing.
04
Step

Handover & Maintenance

We hand over the completed system and provide ongoing after-sales and maintenance services for long-term reliability.

Project Information

Client Name

Arab Bank

Category

Shanghai Mitsubishi Elevator

Location

Dubai, UAE

Units / stops

2 units, 12 stops

Project Status

Completed