The project aimed to enhance the indoor air quality for a VIP terminal by installing air filtration units and fire proof ashtrays units to a more advanced, suitable for 24/7 airport operations.
Features of Project
Space-saving cabin design
Automated sensors
High-capacity filtration System
Multi-stage HEPA + activated carbon filtration
Working Process
01
Step
Site Visit
The site visit includes a detailed location evaluation to assess room ventilation, identify fresh-air supply points, and determine the optimal placement for the filtration or smoking cabin system.
02
Step
Order and production
Order and production involve confirming all technical specifications, initiating customised fabrication of the unit, and coordinating component assembly to ensure the final system meets performance and quality standards
03
Step
Delivery, Testing & Installation
Delivery, installation, and testing include transporting the completed unit to site, executing a precise and safe installation, integrating electrical and ventilation connections, and conducting full operational tests to verify airflow performance, filtration efficiency, and safety compliance.
04
Step
Service Maintenance
Service maintenance includes scheduled inspections, filter replacements if due