EEE Group

Delta Regional Control Center (DRCC)

Delta Regional Control Center (DRCC)

Moving Architecture

About project

At Evergreen Flora B, EEE Group is progressing with the installation of 3 Shanghai Mitsubishi elevator units serving 9 stops. This mid-rise residential development requires dependable and efficient vertical transportation tailored for consistent daily use. The system is being implemented to ensure smooth mobility, reliable performance, and long-term operational stability once commissioned.

Features of Project

Efficient Machine Configuration: Optimized for mid-rise applications with dependable performance.
Energy-Saving Operational Mode: Reduces power consumption during low-traffic periods.
Enhanced Passenger Safety Systems: Includes emergency communication and safety monitoring circuits.
Reliable Door & Cabin Control Mechanisms: Ensures smooth entry and exit cycles with minimal downtime.

Working Process

01
Step

Design & Planning

We study project requirements and create a tailored elevator solution that fits the building’s needs.
02
Step

Engineering & Fabrication

Our team prepares the technical designs and oversees the manufacturing of all components to ensure quality.
03
Step

Installation & Testing

Certified engineers install the system and perform full safety and performance testing.
04
Step

Handover & Maintenance

We hand over the completed system and provide ongoing after-sales and maintenance services for long-term reliability.

Project Information

Client Name

MDEPC

Category

Shanghai Mitsubishi Elevator

Consultant

EDF France

Contractors

Proservice

Location

Talkha, Egypt

Units / stops

3 units, 5 stops

Speed

1.0 m/s

PROJECT STATUS

Completed