EEE Group

Meyan Mall

Meyan Mall

Moving Architecture

About project

Shanghai Mitsubishi supplied four passenger elevator units serving six stops for Meyan Mall, a contemporary commercial retail destination. The elevators were designed to support smooth shopper circulation with reliable performance and comfortable travel. Integrated seamlessly within the mall’s architectural layout, the system enhances accessibility, efficiency, and the overall visitor experience while supporting daily retail operations.

Features of Project

Efficient retail circulation: Four elevator units serving six stops, designed to support smooth movement of shoppers and visitors across mall levels.
Comfortable passenger travel: Stable, vibration-free ride quality to ensure a pleasant experience during peak shopping hours.
Reliable daily operation: Systems engineered for continuous use in a high-traffic retail environment.
Advanced safety features: Equipped with modern safety and emergency systems to ensure secure operation for all users.
Energy-efficient performance: Optimized drive and control technology designed to reduce power consumption while maintaining performance.
Architectural integration: Elevator cabins and entrances designed to blend seamlessly with the mall’s interior design and public spaces.

Working Process

01
Step

Design & Planning

We study project requirements and create a tailored elevator solution that fits the building’s needs.
02
Step

Engineering & Fabrication

Our team prepares the technical designs & oversees the manufacturing of all components to ensure quality.
03
Step

Installation & Testing

Certified engineers install the system and perform full safety and performance testing.
04
Step

Handover & Maintenance

We hand over the completed system and provide ongoing after-sales and maintenance services for long-term reliability.

Project Information

Client Name

Al Waleed Real Estate

Category

Shanghai Mitsubishi Elevator

Consultant

Al Asri Engg. Consultant

Contractors

Sam Building Contractors

Location

Jumeirah, Dubai, UAE

Units / stops

4 units, 6 stops

Project Status

Completed