EEE Group

Al Husseini Towers

Al Husseini Towers

Moving Architecture

About project

Al Hussaini Towers is a prominent high-rise development in Amman, requiring a robust and high-capacity vertical transportation solution to support intensive daily use across multiple floors. The project called for proven technology capable of delivering consistent performance, smooth circulation, and long-term operational reliability.

Our scope included the delivery of 12 elevators from Shanghai Mitsubishi, serving 22 stops, ensuring efficient vertical movement and dependable service in a demanding high-rise environment.

Features of Project

High-capacity system design suited for tall building traffic patterns
Advanced ride comfort and smooth acceleration for frequent use
Proven technology selected for long-term durability
Reliable performance supporting continuous daily operation
Service-friendly configuration to support efficient maintenance

Working Process

01
Step

Design & Planning

We study project requirements and create a tailored elevator solution that fits the building’s needs.
02
Step

Engineering & Fabrication

Our team prepares the technical designs & oversees the manufacturing of all components to ensure quality.
03
Step

Installation & Testing

Certified engineers install the system and perform full safety and performance testing.
04
Step

Handover & Maintenance

We hand over the completed system and provide ongoing after-sales and maintenance services for long-term reliability.

Project Information

Client Name

Al Husseini Group

Category

Shanghai Mitsubishi Elevator

Location

Dubai, UAE

Units / stops

12 units, 22 stops