
ARX engineered a world-first solution that splits the real grass Premier League pitch into three sections before rolling it away into a storage area beneath the South Stand. The 10,000-tonne pitch takes just 25 minutes to retract.
In addition, the entire touchline, pitch surround and player tunnel ramps rise and fall through a height of 1.65m to meet the different levels of the grass and synthetic playing surfaces.