EEE Group

Sobha Crest Grande

Sobha Crest Grande

Moving Architecture

About project

Unifill systems were incorporated into Sobha Crest Grande to support advanced residential construction requirements. The solution helped balance structural performance with material efficiency, contributing to a refined and durable building outcome.

Features of Project

Massive concrete reduction: Reduces concrete usage by up to 20–30%, lowering carbon emissions dramatically.
Lightweight slab design: Creates stronger yet lighter slabs, reducing overall building load.
Eco-friendly recycled material: Void formers are produced from high-quality recycled plastic, supporting circular construction.
Cost-efficient construction: Less concrete, less steel, and faster installation reduce overall project costs.
Improved structural performance: Enhances load distribution and allows for longer spans with fewer columns.
Certified sustainability solution: Fully compliant with international green building standards

Working Process

01
Step

Design & Planning

We study project requirements and create a tailored elevator solution that fits the building’s needs.
02
Step

Engineering & Fabrication

Our team prepares the technical designs and oversees the manufacturing of all components to ensure quality.
03
Step

Installation & Testing

Certified engineers install the system and perform full safety and performance testing.
04
Step

Handover & Maintenance

We hand over the completed system and provide ongoing after-sales and maintenance services for long-term reliability.

Project Information

Project Name

Sobha | Crest Grande

Category

Unifill

Location

United Arab Emirates