EEE Group

The One, JVC

The One, JVC

Moving Architecture

About project

EEE Group supplied Shanghai Mitsubishi elevator saolutions for The One in JVC, a modern hospitality project. The installation supports high guest traffic with efficient vertical mobility, smooth performance, and reliable operation aligned with international hotel standards.

Features of Project

High-capacity system: 8 elevators designed to seamlessly manage peak hotel traffic and guest movement.
Smooth & quiet operation: Premium ride comfort suitable for luxury hospitality.
Advanced safety technology: Equipped with the latest international safety standards.
Energy-efficient performance:Optimized systems to reduce power consumption.
Reliable for high usage: Durable components designed for 24/7 hotel operation.
Elegant cabin finishes: Modern interiors complementing the luxury design of First Collection.

Working Process

01
Step

Design & Planning

We study project requirements and create a tailored elevator solution that fits the building’s needs.
02
Step

Engineering & Fabrication

Our team prepares the technical designs and oversees the manufacturing of all components to ensure quality.
03
Step

Installation & Testing

Certified engineers install the system and perform full safety and performance testing.
04
Step

Handover & Maintenance

We hand over the completed system and provide ongoing after-sales and maintenance services for long-term reliability.

Project Information

Client Name

Professional Choice Real Estate

Category

Shanghai Mitsubishi Elevator

Consultant

ECG Engineering Consultant

Contractors

China Railway 18th Bureau

Location

Business Bay, Dubai, UAE

Units / stops

8 units, 20 stops