EEE Group

MC Gettigans

MC Gettigans

Moving Architecture

About project

The project focused on significantly improving indoor air quality across the bar areas by installing high-efficiency air-filtration units, engineered to handle continuous usage while ensuring cleaner air, reduced odour.

Features of Project

High-capacity filtration System
Low-noise units,
Multi-stage HEPA + activated carbon filtration

Working Process

01
Step

Site Visit

The site visit includes a detailed location evaluation to assess room ventilation, identify fresh-air supply points, and determine the optimal placement for the filtration or smoking cabin system.
02
Step

Order and production

Order & production involve confirming all technical specifications, initiating customised fabrication of the unit, and coordinating component assembly to ensure the final system meets performance and quality standards.
03
Step

Delivery, Testing & Installation

Delivery, installation, and testing include transporting the completed unit to site, executing a precise and safe installation, integrating electrical and ventilation connections, and conducting full operational tests to verify airflow performance, filtration efficiency, and safety compliance.
04
Step

Service Maintenance

Service maintenance includes scheduled inspections, filter replacements if due.

Project Information

Client Name

Dusit Thani

Category

QleanAir

Location

Abu Dhabi, UAE

Units / stops

2 units AQ Low 115 10 units AQ High Ceiling