EEE Group

Marhaba Lounge

Marhaba Lounge

Moving Architecture

About project

The project aimed to enhance the indoor air quality for a VIP terminal by installing air filtration units and fire proof ashtrays units to a more advanced, suitable for 24/7 airport operations.

Features of Project

Space-saving cabin design
Automated sensors
High-capacity filtration System
Multi-stage HEPA + activated carbon filtration

Working Process

01
Step

Site Visit

The site visit includes a detailed location evaluation to assess room ventilation, identify fresh-air supply points, and determine the optimal placement for the filtration or smoking cabin system.
02
Step

Order and production

Order and production involve confirming all technical specifications, initiating customised fabrication of the unit, and coordinating component assembly to ensure the final system meets performance and quality standards
03
Step

Delivery, Testing & Installation

Delivery, installation, and testing include transporting the completed unit to site, executing a precise and safe installation, integrating electrical and ventilation connections, and conducting full operational tests to verify airflow performance, filtration efficiency, and safety compliance.
04
Step

Service Maintenance

Service maintenance includes scheduled inspections, filter replacements if due

Project Information

Client Name

DNATA

Category

QleanAir

Location

UAE

Units / stops

4 units Smoking Cabins